POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Breackerie wind farm

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:201e581337a078018527ae73 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:f7df56deef6fcc270dfe1eb2
to_kindpower_object
to_idneso:connection_site:201e581337a078018527ae73
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:270

Sources EV-adc0d31f72fd0a6d3f744acc
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 218f7a63c9cef4580693bff269c7f6d4d99c534ef0716c87a064b855acb0466b

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Breackerie wind farm

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-adc0d31f72fd0a6d3f744acc
MW Increase / Decrease90.8 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-adc0d31f72fd0a6d3f744acc
Cumulative Total Capacity (MW)90.8 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-adc0d31f72fd0a6d3f744acc
Detailed source fields
Original source fieldPublished value or condition
Project NameBreackerie wind farm
Customer NameENERGYFARM UK BREACKERIE LTD
Connection SiteBreackerie 132kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease90.80
Cumulative Total Capacity (MW)90.80
MW Effective From2037-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TOSHET
Plant TypeEnergy Storage System;Wind Onshore
Project IDa0lJ9000000PN5RIAW
Project NumberPRO-005965
GateNot obtained
Original textScoping
source_record_idcsv:row:270

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:270

Sources EV-adc0d31f72fd0a6d3f744acc
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 218f7a63c9cef4580693bff269c7f6d4d99c534ef0716c87a064b855acb0466b

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Breackerie wind farm

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameBreackerie wind farm
Customer NameENERGYFARM UK BREACKERIE LTD
Connection SiteBreackerie 132kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease90.80
Cumulative Total Capacity (MW)90.80
MW Effective From2037-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TOSHET
Plant TypeEnergy Storage System;Wind Onshore
Project IDa0lJ9000000PN5RIAW
Project NumberPRO-005965
GateNot obtained
Original textScoping
source_record_idcsv:row:270

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:270

Sources EV-adc0d31f72fd0a6d3f744acc
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 218f7a63c9cef4580693bff269c7f6d4d99c534ef0716c87a064b855acb0466b

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel