POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Fasnakyle G1 & G2

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:5d1d64bb4e20cd49730ad9eb · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:f5d2fdef834324ef5f2d0ce6
to_kindpower_object
to_idneso:connection_site:5d1d64bb4e20cd49730ad9eb
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:757

Sources EV-ce68afb83afe499971fe98f9
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 cbcefd560f04e6a873e37547491bc3fe322ad3f9e5171e29c3957c4188afd100

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Fasnakyle G1 & G2

Connection register · built

Metric or conditionSource valueBasis, scope and stage
MW Connected46 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-ce68afb83afe499971fe98f9
MW Increase / Decrease0 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-ce68afb83afe499971fe98f9
Cumulative Total Capacity (MW)46 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-ce68afb83afe499971fe98f9
Detailed source fields
Original source fieldPublished value or condition
Project NameFasnakyle G1 & G2
Customer NameSSE GENERATION LIMITED
Connection SiteFasnakyle GSP
StageNot obtained
MW Connected46.00
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)46.00
MW Effective FromNot obtained
Project StatusBuilt
Agreement TypeDirect Connection
HOST TOSHET
Plant TypeHydro
Project IDa0l4L0000005imlQAA
Project NumberPRO-000077
GateNot obtained
Original textBuilt
source_record_idcsv:row:757

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:757

Sources EV-ce68afb83afe499971fe98f9
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 cbcefd560f04e6a873e37547491bc3fe322ad3f9e5171e29c3957c4188afd100

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Fasnakyle G1 & G2

project stage · built

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameFasnakyle G1 & G2
Customer NameSSE GENERATION LIMITED
Connection SiteFasnakyle GSP
StageNot obtained
MW Connected46.00
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)46.00
MW Effective FromNot obtained
Project StatusBuilt
Agreement TypeDirect Connection
HOST TOSHET
Plant TypeHydro
Project IDa0l4L0000005imlQAA
Project NumberPRO-000077
GateNot obtained
Original textBuilt
source_record_idcsv:row:757

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:757

Sources EV-ce68afb83afe499971fe98f9
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 cbcefd560f04e6a873e37547491bc3fe322ad3f9e5171e29c3957c4188afd100

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel