POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Butlers Wood Green Energy Centre

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:7dfbbfe802e6580ebc4c23d4 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:df548063f1cce550b6ea9bdc
to_kindpower_object
to_idneso:connection_site:7dfbbfe802e6580ebc4c23d4
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:323

Sources EV-3a0e6af8ee7ba4b1f222ea0b
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 c76342ec5405e1215b2527700889af6213a804198f507764e9f95460f0260087

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Butlers Wood Green Energy Centre

Connection register · awaiting consents

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-3a0e6af8ee7ba4b1f222ea0b
MW Increase / Decrease1025 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-3a0e6af8ee7ba4b1f222ea0b
Cumulative Total Capacity (MW)1025 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-3a0e6af8ee7ba4b1f222ea0b
Detailed source fields
Original source fieldPublished value or condition
Project NameButlers Wood Green Energy Centre
Customer NameBUTLERS WOOD NG LIMITED
Connection SiteButlers Wood 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease1025.00
Cumulative Total Capacity (MW)1025.00
MW Effective From2031-10-30
Project StatusAwaiting Consents
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l4L0000005ixpQAA
Project NumberPRO-002416
GateNot obtained
Original textAwaiting Consents
source_record_idcsv:row:323

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:323

Sources EV-3a0e6af8ee7ba4b1f222ea0b
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 c76342ec5405e1215b2527700889af6213a804198f507764e9f95460f0260087

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Butlers Wood Green Energy Centre

project stage · awaiting consents

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameButlers Wood Green Energy Centre
Customer NameBUTLERS WOOD NG LIMITED
Connection SiteButlers Wood 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease1025.00
Cumulative Total Capacity (MW)1025.00
MW Effective From2031-10-30
Project StatusAwaiting Consents
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l4L0000005ixpQAA
Project NumberPRO-002416
GateNot obtained
Original textAwaiting Consents
source_record_idcsv:row:323

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:323

Sources EV-3a0e6af8ee7ba4b1f222ea0b
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 c76342ec5405e1215b2527700889af6213a804198f507764e9f95460f0260087

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel