POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Cilfynydd Green Energy Centre

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:44e11e3458a3e2ba0feeb2f8 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:d6ea3b59779df1e4199fc81f
to_kindpower_object
to_idneso:connection_site:44e11e3458a3e2ba0feeb2f8
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:404

Sources EV-588cc10e1d4ad7961c3ac29e
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 5d7ca37338a87d139b48826ec89a91286d81ebf5201471365d449cd88fb09c3c

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Cilfynydd Green Energy Centre

Connection register · awaiting consents

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-588cc10e1d4ad7961c3ac29e
MW Increase / Decrease400 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-588cc10e1d4ad7961c3ac29e
Cumulative Total Capacity (MW)400 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-588cc10e1d4ad7961c3ac29e
Detailed source fields
Original source fieldPublished value or condition
Project NameCilfynydd Green Energy Centre
Customer NameCILFYNYDD NG LIMITED
Connection SiteCilfynydd 400kV Substation
Stage1.00
MW Connected0.00
MW Increase / Decrease400.00
Cumulative Total Capacity (MW)400.00
MW Effective From2029-10-30
Project StatusAwaiting Consents
Agreement TypeDirect Connection
HOST TONGET
Plant TypeDemand;Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Project IDa0l4L0000005idMQAQ
Project NumberPRO-001663-1
Gate1
Original textAwaiting Consents
source_record_idcsv:row:404

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:404

Sources EV-588cc10e1d4ad7961c3ac29e
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 5d7ca37338a87d139b48826ec89a91286d81ebf5201471365d449cd88fb09c3c

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Cilfynydd Green Energy Centre

project stage · awaiting consents

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameCilfynydd Green Energy Centre
Customer NameCILFYNYDD NG LIMITED
Connection SiteCilfynydd 400kV Substation
Stage1.00
MW Connected0.00
MW Increase / Decrease400.00
Cumulative Total Capacity (MW)400.00
MW Effective From2029-10-30
Project StatusAwaiting Consents
Agreement TypeDirect Connection
HOST TONGET
Plant TypeDemand;Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Project IDa0l4L0000005idMQAQ
Project NumberPRO-001663-1
Gate1
Original textAwaiting Consents
source_record_idcsv:row:404

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:404

Sources EV-588cc10e1d4ad7961c3ac29e
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 5d7ca37338a87d139b48826ec89a91286d81ebf5201471365d449cd88fb09c3c

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel