POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Axminster

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:156464b765711fbf696a755e · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:d3f150ef05ef5d934568c4d0
to_kindpower_object
to_idneso:connection_site:156464b765711fbf696a755e
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:98

Sources EV-2e40398e0980786e5b96d28f
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 97f9103c4d9c2f0e368635d6f4f3143a570821f96e19ad220cf707389b361f18

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Axminster

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-2e40398e0980786e5b96d28f
MW Increase / Decrease49.9 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-2e40398e0980786e5b96d28f
Cumulative Total Capacity (MW)49.9 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-2e40398e0980786e5b96d28f
Detailed source fields
Original source fieldPublished value or condition
Project NameAxminster
Customer NamePIVOTED POWER LLP
Connection SiteAxminster 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease49.90
Cumulative Total Capacity (MW)49.90
MW Effective From2027-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System
Project IDa0l4L0000005iufQAA
Project NumberPRO-001143
Gate1
Original textScoping
source_record_idcsv:row:98

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:98

Sources EV-2e40398e0980786e5b96d28f
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 97f9103c4d9c2f0e368635d6f4f3143a570821f96e19ad220cf707389b361f18

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Axminster

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameAxminster
Customer NamePIVOTED POWER LLP
Connection SiteAxminster 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease49.90
Cumulative Total Capacity (MW)49.90
MW Effective From2027-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System
Project IDa0l4L0000005iufQAA
Project NumberPRO-001143
Gate1
Original textScoping
source_record_idcsv:row:98

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:98

Sources EV-2e40398e0980786e5b96d28f
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 97f9103c4d9c2f0e368635d6f4f3143a570821f96e19ad220cf707389b361f18

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel