POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Banc y Celyn Energy Park

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:24ebaad282ea24df42ad96a8 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:8ba0d56eece5c63399dce2f8
to_kindpower_object
to_idneso:connection_site:24ebaad282ea24df42ad96a8
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:120

Sources EV-aa996a39335f8123fdba21b3
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 ff847dc41be6ab07b8a009fb03eb12ab9f92c18668606edb750a74721f05340a

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Banc y Celyn Energy Park

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-aa996a39335f8123fdba21b3
MW Increase / Decrease165 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-aa996a39335f8123fdba21b3
Cumulative Total Capacity (MW)165 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-aa996a39335f8123fdba21b3
Detailed source fields
Original source fieldPublished value or condition
Project NameBanc y Celyn Energy Park
Customer NameWind 2 Project 2 Limited
Connection SiteFuture Swansea North 132kV
StageNot obtained
MW Connected0.00
MW Increase / Decrease165.00
Cumulative Total Capacity (MW)165.00
MW Effective From2033-07-01
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Project IDa0l4L0000005ia8QAA
Project NumberPRO-002011
GateNot obtained
Original textScoping
source_record_idcsv:row:120

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:120

Sources EV-aa996a39335f8123fdba21b3
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 ff847dc41be6ab07b8a009fb03eb12ab9f92c18668606edb750a74721f05340a

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Banc y Celyn Energy Park

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameBanc y Celyn Energy Park
Customer NameWind 2 Project 2 Limited
Connection SiteFuture Swansea North 132kV
StageNot obtained
MW Connected0.00
MW Increase / Decrease165.00
Cumulative Total Capacity (MW)165.00
MW Effective From2033-07-01
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Project IDa0l4L0000005ia8QAA
Project NumberPRO-002011
GateNot obtained
Original textScoping
source_record_idcsv:row:120

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:120

Sources EV-aa996a39335f8123fdba21b3
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 ff847dc41be6ab07b8a009fb03eb12ab9f92c18668606edb750a74721f05340a

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel