POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

AGS Calderside Battery Energy Storage System

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:75a3ec5745bc00719a56a4e1 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:54bdbce972057936b132aabe
to_kindpower_object
to_idneso:connection_site:75a3ec5745bc00719a56a4e1
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:26

Sources EV-047fd9d259430767a3069b8d
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 b48b9d9caf152502bc133c5ca6b81907d06e5506bd37da9cb03f0e447a21f56e

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

AGS Calderside Battery Energy Storage System

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-047fd9d259430767a3069b8d
MW Increase / Decrease200 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-047fd9d259430767a3069b8d
Cumulative Total Capacity (MW)500 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-047fd9d259430767a3069b8d
Detailed source fields
Original source fieldPublished value or condition
Project NameAGS Calderside Battery Energy Storage System
Customer NameAdvance Grid Solutions Limited
Connection SiteAGS CALDERSIDE 275KV SUBSTATION
Stage2.00
MW Connected0.00
MW Increase / Decrease200.00
Cumulative Total Capacity (MW)500.00
MW Effective From2033-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TOSPT
Plant TypeEnergy Storage System
Project IDa0l8e0000010wexAAA
Project NumberPRO-002752-2
GateNot obtained
Original textScoping
source_record_idcsv:row:26

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:26

Sources EV-047fd9d259430767a3069b8d
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 b48b9d9caf152502bc133c5ca6b81907d06e5506bd37da9cb03f0e447a21f56e

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

AGS Calderside Battery Energy Storage System

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameAGS Calderside Battery Energy Storage System
Customer NameAdvance Grid Solutions Limited
Connection SiteAGS CALDERSIDE 275KV SUBSTATION
Stage2.00
MW Connected0.00
MW Increase / Decrease200.00
Cumulative Total Capacity (MW)500.00
MW Effective From2033-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TOSPT
Plant TypeEnergy Storage System
Project IDa0l8e0000010wexAAA
Project NumberPRO-002752-2
GateNot obtained
Original textScoping
source_record_idcsv:row:26

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:26

Sources EV-047fd9d259430767a3069b8d
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 b48b9d9caf152502bc133c5ca6b81907d06e5506bd37da9cb03f0e447a21f56e

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel