POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Hope Battery Storage

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:4d91c1d2c9f937b334c9aefd · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:4895948006f6fbdf33622b6a
to_kindpower_object
to_idneso:connection_site:4d91c1d2c9f937b334c9aefd
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1027

Sources EV-61b58ee640a6b67213f24b44
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 89bcdc618ec8fc545b89a6d1c1204b5e838df11b516b080ae783ad030d5e3d55

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Hope Battery Storage

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-61b58ee640a6b67213f24b44
MW Increase / Decrease400 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-61b58ee640a6b67213f24b44
Cumulative Total Capacity (MW)400 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-61b58ee640a6b67213f24b44
Detailed source fields
Original source fieldPublished value or condition
Project NameHope Battery Storage
Customer NameIBV BRINKBURN ENERGY PARK LIMITED
Connection SiteBlyth 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease400.00
Cumulative Total Capacity (MW)400.00
MW Effective From2036-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System
Project IDa0l4L0000005j8QQAQ
Project NumberPRO-002520
Gate1
Original textScoping
source_record_idcsv:row:1027

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1027

Sources EV-61b58ee640a6b67213f24b44
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 89bcdc618ec8fc545b89a6d1c1204b5e838df11b516b080ae783ad030d5e3d55

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Hope Battery Storage

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameHope Battery Storage
Customer NameIBV BRINKBURN ENERGY PARK LIMITED
Connection SiteBlyth 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease400.00
Cumulative Total Capacity (MW)400.00
MW Effective From2036-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System
Project IDa0l4L0000005j8QQAQ
Project NumberPRO-002520
Gate1
Original textScoping
source_record_idcsv:row:1027

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1027

Sources EV-61b58ee640a6b67213f24b44
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 89bcdc618ec8fc545b89a6d1c1204b5e838df11b516b080ae783ad030d5e3d55

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel