POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Berkswell Energy Storage

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:0be92450ba2c4adc561027b8 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:3b7bbca22aac17b0f358a685
to_kindpower_object
to_idneso:connection_site:0be92450ba2c4adc561027b8
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:164

Sources EV-ee6270d1ebbdc7a03dcae0d5
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 af715972e946438e7d0a5b0165aaf252ca7b5bbcac9be578b5d7ca17483c0728

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Berkswell Energy Storage

Connection register · under construction or commissioning

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-ee6270d1ebbdc7a03dcae0d5
MW Increase / Decrease200 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-ee6270d1ebbdc7a03dcae0d5
Cumulative Total Capacity (MW)200 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-ee6270d1ebbdc7a03dcae0d5
Detailed source fields
Original source fieldPublished value or condition
Project NameBerkswell Energy Storage
Customer NameBERKSWELL BATTERY STORAGE LIMITED
Connection SiteBerkswell 275kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease200.00
Cumulative Total Capacity (MW)200.00
MW Effective From2027-10-31
Project StatusUnder Construction/Commissioning
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System
Project IDa0l4L0000005ixbQAA
Project NumberPRO-001788
Gate2
Original textUnder Construction/Commissioning
source_record_idcsv:row:164

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:164

Sources EV-ee6270d1ebbdc7a03dcae0d5
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 af715972e946438e7d0a5b0165aaf252ca7b5bbcac9be578b5d7ca17483c0728

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Berkswell Energy Storage

project stage · under construction or commissioning

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameBerkswell Energy Storage
Customer NameBERKSWELL BATTERY STORAGE LIMITED
Connection SiteBerkswell 275kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease200.00
Cumulative Total Capacity (MW)200.00
MW Effective From2027-10-31
Project StatusUnder Construction/Commissioning
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System
Project IDa0l4L0000005ixbQAA
Project NumberPRO-001788
Gate2
Original textUnder Construction/Commissioning
source_record_idcsv:row:164

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:164

Sources EV-ee6270d1ebbdc7a03dcae0d5
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 af715972e946438e7d0a5b0165aaf252ca7b5bbcac9be578b5d7ca17483c0728

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel