POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Bowsheil Solar and Battery

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:186353dbf3fd264c4223226d · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:153e32e7373f3874d15afa12
to_kindpower_object
to_idneso:connection_site:186353dbf3fd264c4223226d
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:237

Sources EV-c3f21066c77586a227f9f4ff
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 662f216e216df0bc3cf7b372c632d647784769d7432cdb5bf7d0e94a0051dcb2

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Bowsheil Solar and Battery

Connection register · awaiting consents

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-c3f21066c77586a227f9f4ff
MW Increase / Decrease166.61 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-c3f21066c77586a227f9f4ff
Cumulative Total Capacity (MW)166.61 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-c3f21066c77586a227f9f4ff
Detailed source fields
Original source fieldPublished value or condition
Project NameBowsheil Solar and Battery
Customer NameVOLTALIA UK LTD
Connection SiteBowsheils 132kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease166.61
Cumulative Total Capacity (MW)166.61
MW Effective From2031-10-31
Project StatusAwaiting Consents
Agreement TypeDirect Connection
HOST TOSPT
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l8e0000010wXGAAY
Project NumberPRO-002662
GateNot obtained
Original textAwaiting Consents
source_record_idcsv:row:237

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:237

Sources EV-c3f21066c77586a227f9f4ff
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 662f216e216df0bc3cf7b372c632d647784769d7432cdb5bf7d0e94a0051dcb2

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Bowsheil Solar and Battery

project stage · awaiting consents

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameBowsheil Solar and Battery
Customer NameVOLTALIA UK LTD
Connection SiteBowsheils 132kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease166.61
Cumulative Total Capacity (MW)166.61
MW Effective From2031-10-31
Project StatusAwaiting Consents
Agreement TypeDirect Connection
HOST TOSPT
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l8e0000010wXGAAY
Project NumberPRO-002662
GateNot obtained
Original textAwaiting Consents
source_record_idcsv:row:237

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:237

Sources EV-c3f21066c77586a227f9f4ff
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 662f216e216df0bc3cf7b372c632d647784769d7432cdb5bf7d0e94a0051dcb2

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel