POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_embedded

Torrance Warm Wind Farm

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:4a455cfeb0fd8ef6c61be268 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_embedded:d89daf4cd77d138d98835704
to_kindpower_object
to_idneso:connection_site:4a455cfeb0fd8ef6c61be268
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:529

Sources EV-b6ea824d8b62ca229c8974f2
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 8dfe815ed0a97c379590e49cc28033c21087c0c0326c59ae576bad7d967f8e98

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_embedded

Torrance Warm Wind Farm

Connection register · built

Metric or conditionSource valueBasis, scope and stage
MW Connected9 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-b6ea824d8b62ca229c8974f2
MW Increase / Decrease0 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-b6ea824d8b62ca229c8974f2
Cumulative Total Capacity (MW)9 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-b6ea824d8b62ca229c8974f2
Detailed source fields
Original source fieldPublished value or condition
Project NameTorrance Warm Wind Farm
Customer NameSP DISTRIBUTION PLC
Connection SiteBathgate 132/33kV
StageNot obtained
MW Connected9.00
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)9.00
MW Effective FromNot obtained
Project StatusBuilt
HOST TOSPT
Plant TypeWind Onshore
Project IDa0l4L0000005iOEQAY
Project NumberPRO-000869
GateNot obtained
Original textBuilt
source_record_idcsv:row:529

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:529

Sources EV-b6ea824d8b62ca229c8974f2
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 8dfe815ed0a97c379590e49cc28033c21087c0c0326c59ae576bad7d967f8e98

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_embedded

Torrance Warm Wind Farm

project stage · built

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameTorrance Warm Wind Farm
Customer NameSP DISTRIBUTION PLC
Connection SiteBathgate 132/33kV
StageNot obtained
MW Connected9.00
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)9.00
MW Effective FromNot obtained
Project StatusBuilt
HOST TOSPT
Plant TypeWind Onshore
Project IDa0l4L0000005iOEQAY
Project NumberPRO-000869
GateNot obtained
Original textBuilt
source_record_idcsv:row:529

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:529

Sources EV-b6ea824d8b62ca229c8974f2
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 8dfe815ed0a97c379590e49cc28033c21087c0c0326c59ae576bad7d967f8e98

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel