POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_embedded

Braco West (Formerly Braco) GSP

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:5f0e0ad9cfb08c5a9335ee65 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_embedded:a8daca43c981f8bdf16e588d
to_kindpower_object
to_idneso:connection_site:5f0e0ad9cfb08c5a9335ee65
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:81

Sources EV-c76c3b5e7192c70d9499103f
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 ec1683cfec2dfcb9760721920f0fb8479aee398fdb475a64d90b5f06f0d132cf

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_embedded

Braco West (Formerly Braco) GSP

Connection register · awaiting consents

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-c76c3b5e7192c70d9499103f
MW Increase / Decrease0.12 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-c76c3b5e7192c70d9499103f
Cumulative Total Capacity (MW)0.12 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-c76c3b5e7192c70d9499103f
Detailed source fields
Original source fieldPublished value or condition
Project NameBraco West (Formerly Braco) GSP
Customer NameScottish Hydro Electric Power Distribution Plc
Connection SiteBraco West GSP
StageNot obtained
MW Connected0.00
MW Increase / Decrease0.12
Cumulative Total Capacity (MW)0.12
MW Effective From2024-12-30
Project StatusAwaiting Consents
HOST TOSHET
Plant TypeEnergy Storage System
Project IDa0l8e000000TPOzAAO
Project NumberPRO-003294
GateNot obtained
Original textAwaiting Consents
source_record_idcsv:row:81

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:81

Sources EV-c76c3b5e7192c70d9499103f
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 ec1683cfec2dfcb9760721920f0fb8479aee398fdb475a64d90b5f06f0d132cf

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_embedded

Braco West (Formerly Braco) GSP

project stage · awaiting consents

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameBraco West (Formerly Braco) GSP
Customer NameScottish Hydro Electric Power Distribution Plc
Connection SiteBraco West GSP
StageNot obtained
MW Connected0.00
MW Increase / Decrease0.12
Cumulative Total Capacity (MW)0.12
MW Effective From2024-12-30
Project StatusAwaiting Consents
HOST TOSHET
Plant TypeEnergy Storage System
Project IDa0l8e000000TPOzAAO
Project NumberPRO-003294
GateNot obtained
Original textAwaiting Consents
source_record_idcsv:row:81

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:81

Sources EV-c76c3b5e7192c70d9499103f
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 ec1683cfec2dfcb9760721920f0fb8479aee398fdb475a64d90b5f06f0d132cf

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel