POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_embedded

Seggiecrook PV and BESS

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:50959469594ed0bf318ae37d · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_embedded:a2eab84cee6561ad0cb54f31
to_kindpower_object
to_idneso:connection_site:50959469594ed0bf318ae37d
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:479

Sources EV-8cd414f341a69fa8bc8ebb00
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 8cf47cf8dee9c3b22e779cff96866506df6681a26d894f3dc5904648412a42ee

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_embedded

Seggiecrook PV and BESS

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-8cd414f341a69fa8bc8ebb00
MW Increase / Decrease66.32 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-8cd414f341a69fa8bc8ebb00
Cumulative Total Capacity (MW)66.32 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-8cd414f341a69fa8bc8ebb00
Detailed source fields
Original source fieldPublished value or condition
Project NameSeggiecrook PV and BESS
Customer NameGREENTECH PROJECTS HOLDING UK LIMITED
Connection SiteBlackhillock 2 400/33KV Grid Supply Point Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease66.32
Cumulative Total Capacity (MW)66.32
MW Effective From2035-10-31
Project StatusScoping
HOST TOSHET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0lJ9000000POgAIAW
Project NumberPRO-006074
Gate1
Original textScoping
source_record_idcsv:row:479

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:479

Sources EV-8cd414f341a69fa8bc8ebb00
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 8cf47cf8dee9c3b22e779cff96866506df6681a26d894f3dc5904648412a42ee

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_embedded

Seggiecrook PV and BESS

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameSeggiecrook PV and BESS
Customer NameGREENTECH PROJECTS HOLDING UK LIMITED
Connection SiteBlackhillock 2 400/33KV Grid Supply Point Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease66.32
Cumulative Total Capacity (MW)66.32
MW Effective From2035-10-31
Project StatusScoping
HOST TOSHET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0lJ9000000POgAIAW
Project NumberPRO-006074
Gate1
Original textScoping
source_record_idcsv:row:479

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:479

Sources EV-8cd414f341a69fa8bc8ebb00
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 8cf47cf8dee9c3b22e779cff96866506df6681a26d894f3dc5904648412a42ee

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel