POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_embedded

Clachaig Glen Wind Farm

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:a10b20597db4b41b3b0d4d60 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_embedded:85843fe648c1df6063f5f9a1
to_kindpower_object
to_idneso:connection_site:a10b20597db4b41b3b0d4d60
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:135

Sources EV-4f7b83101f413dc2b70b80c1
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 cbba5a6a4d39149f4c681e093855022325be367fc31ebbcda2e4ecac3668b6c1

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_embedded

Clachaig Glen Wind Farm

Connection register · awaiting consents

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-4f7b83101f413dc2b70b80c1
MW Increase / Decrease47.6 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-4f7b83101f413dc2b70b80c1
Cumulative Total Capacity (MW)47.6 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-4f7b83101f413dc2b70b80c1
Detailed source fields
Original source fieldPublished value or condition
Project NameClachaig Glen Wind Farm
Customer NameRWE Renewables UK Onshore Wind Limited
Connection SiteCarradale 2 132/33kV GSP Substation
Stage1.00
MW Connected0.00
MW Increase / Decrease47.60
Cumulative Total Capacity (MW)47.60
MW Effective From2025-04-30
Project StatusAwaiting Consents
HOST TOSHET
Plant TypeEnergy Storage System;Wind Onshore
Project IDa0l4L0000005iPqQAI
Project NumberPRO-000878-1
GateNot obtained
Original textAwaiting Consents
source_record_idcsv:row:135

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:135

Sources EV-4f7b83101f413dc2b70b80c1
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 cbba5a6a4d39149f4c681e093855022325be367fc31ebbcda2e4ecac3668b6c1

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_embedded

Clachaig Glen Wind Farm

project stage · awaiting consents

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameClachaig Glen Wind Farm
Customer NameRWE Renewables UK Onshore Wind Limited
Connection SiteCarradale 2 132/33kV GSP Substation
Stage1.00
MW Connected0.00
MW Increase / Decrease47.60
Cumulative Total Capacity (MW)47.60
MW Effective From2025-04-30
Project StatusAwaiting Consents
HOST TOSHET
Plant TypeEnergy Storage System;Wind Onshore
Project IDa0l4L0000005iPqQAI
Project NumberPRO-000878-1
GateNot obtained
Original textAwaiting Consents
source_record_idcsv:row:135

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:135

Sources EV-4f7b83101f413dc2b70b80c1
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 cbba5a6a4d39149f4c681e093855022325be367fc31ebbcda2e4ecac3668b6c1

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel