POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_embedded

Colton Solar Farm

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:5820fdef41396e9af542ba39 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_embedded:6f1a42d940b8800369a6cd85
to_kindpower_object
to_idneso:connection_site:5820fdef41396e9af542ba39
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:143

Sources EV-204f292368e580c19631d6e1
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 27756c9fe01ab2e554ace5b117dd381a6d055b589bd7a6cbf4581dd5642b504a

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_embedded

Colton Solar Farm

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-204f292368e580c19631d6e1
MW Increase / Decrease29.9 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-204f292368e580c19631d6e1
Cumulative Total Capacity (MW)29.9 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-204f292368e580c19631d6e1
Detailed source fields
Original source fieldPublished value or condition
Project NameColton Solar Farm
Customer NameSP DISTRIBUTION PLC
Connection SiteDunfermline 132/33kV
StageNot obtained
MW Connected0.00
MW Increase / Decrease29.90
Cumulative Total Capacity (MW)29.90
MW Effective From2023-12-31
Project StatusScoping
HOST TOSPT
Plant TypeWind Onshore
Project IDa0l4L0000005iNiQAI
Project NumberPRO-001818
GateNot obtained
Original textScoping
source_record_idcsv:row:143

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:143

Sources EV-204f292368e580c19631d6e1
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 27756c9fe01ab2e554ace5b117dd381a6d055b589bd7a6cbf4581dd5642b504a

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_embedded

Colton Solar Farm

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameColton Solar Farm
Customer NameSP DISTRIBUTION PLC
Connection SiteDunfermline 132/33kV
StageNot obtained
MW Connected0.00
MW Increase / Decrease29.90
Cumulative Total Capacity (MW)29.90
MW Effective From2023-12-31
Project StatusScoping
HOST TOSPT
Plant TypeWind Onshore
Project IDa0l4L0000005iNiQAI
Project NumberPRO-001818
GateNot obtained
Original textScoping
source_record_idcsv:row:143

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:143

Sources EV-204f292368e580c19631d6e1
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 27756c9fe01ab2e554ace5b117dd381a6d055b589bd7a6cbf4581dd5642b504a

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel