POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Ballach

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:5993b4c1af21b1deb445cae5 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:08602476533fee326096deea
to_kindpower_object
to_idneso:connection_site:5993b4c1af21b1deb445cae5
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:113

Sources EV-f38458292aacabe96e69dcbc
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 aeff24621576774b0e2c787cc2a439e472d7de3d0b72a70356ec7e1c0289ad49

Usage terms NESO Open Data Licence

Evidence relationships · GBR · neso_tec

Meall Dearg

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:5993b4c1af21b1deb445cae5 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:afd3c83167b2eb18d61361ef
to_kindpower_object
to_idneso:connection_site:5993b4c1af21b1deb445cae5
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1366

Sources EV-ec6c35d93c9f8f4cbfb47372
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 ba8f1c5346c6b97ccd35e7bf1c229492278861a2aead6d8c770d0aadc3821eb4

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

New North West 132kV Substation

Connection-site name reference · Unverified

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
source_record_idNew North West 132kV Substation

No separate metric summary is available. Consult the detailed source fields.

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:113

Sources EV-f38458292aacabe96e69dcbc
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 aeff24621576774b0e2c787cc2a439e472d7de3d0b72a70356ec7e1c0289ad49

Usage terms NESO Open Data Licence

neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1366

Sources EV-ec6c35d93c9f8f4cbfb47372
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 ba8f1c5346c6b97ccd35e7bf1c229492278861a2aead6d8c770d0aadc3821eb4

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel