POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_embedded

Balmore WTW

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:11a02eec895af5dcc03af68e · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_embedded:c9ac608f86647e5c74a3464c
to_kindpower_object
to_idneso:connection_site:11a02eec895af5dcc03af68e
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:41

Sources EV-dc9404113ade165d100e72dc
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 5087496aa7254df2d5376666e409bf0419422da9a178e8f969f30bfb9ed0190f

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_embedded

Killermont 132/33kV

Connection-site name reference · Unverified

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
source_record_idKillermont 132/33kV

No separate metric summary is available. Consult the detailed source fields.

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:41

Sources EV-dc9404113ade165d100e72dc
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 5087496aa7254df2d5376666e409bf0419422da9a178e8f969f30bfb9ed0190f

Usage terms NESO Open Data Licence

neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:361

Sources EV-99a89630d495bb224d043920
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 df89234a770d55ad262d77e96f6c5666a47ae6694e6e08d54d13c554a00ebadf

Usage terms NESO Open Data Licence

Evidence relationships · GBR · neso_embedded

Lochfauld Solar Park

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:11a02eec895af5dcc03af68e · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_embedded:9e7c1b41f11b6e9665dcb208
to_kindpower_object
to_idneso:connection_site:11a02eec895af5dcc03af68e
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:361

Sources EV-99a89630d495bb224d043920
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 df89234a770d55ad262d77e96f6c5666a47ae6694e6e08d54d13c554a00ebadf

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel