POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 13items · current page 1–13 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 고옥-득량 지중T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-8f8c95fcbe47ca8c03278245
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_933223e330b41e2a
stable_project_keyprjtDef:233621:ESB
project_definition233621
first_region_codeESB
manual_source_formatfalse
project_name154kV 고옥-득량 지중T/L 건설사업
project_name_list154kV 고옥-득량 지중송전선로 건설사업
purpose고흥S/S 단일계통 보강 및 분산형전원 연계
project_region_detail전남광주통합특별시 고흥군,보성군
project_period_raw2021.07~2028.10
project_scale_raw154KV XLPE 2,000㎟ X 2C(D) - 8.7KM
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type지중송전
headquarters중부건설본부
office광주전남건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_3913ce412993c662
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_933223e330b41e2a

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_933223e330b41e2a

Sources EV-8f8c95fcbe47ca8c03278245
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 0b9ce67bd6581d63d3c2fd8593e838dc6195aaf778d3a485013a0408c5f1fb80
Source schedule candidates · KOR · kepco_planned

154kV 고옥-득량 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2028-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_3913ce412993c662

Sources EV-696525cf342a21f11988671a
Evidence SHA-256 e4d8655cb49c5c8f77b6c2ac55ae0b469abeae737c4174db6d8130805d636baf
행 SHA-256 8ef44ad16ad6a458f0e8cbb77e3b6fcf0d96d25d169e66aa7edbe573c1747c98
Source schedule candidates · KOR · kepco_planned

154kV 고옥-득량 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2026-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_3913ce412993c662

Sources EV-696525cf342a21f11988671a
Evidence SHA-256 e4d8655cb49c5c8f77b6c2ac55ae0b469abeae737c4174db6d8130805d636baf
행 SHA-256 8ef44ad16ad6a458f0e8cbb77e3b6fcf0d96d25d169e66aa7edbe573c1747c98
Source schedule candidates · KOR · kepco_planned

154kV 고옥-득량 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2021-07
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_3913ce412993c662

Sources EV-696525cf342a21f11988671a
Evidence SHA-256 e4d8655cb49c5c8f77b6c2ac55ae0b469abeae737c4174db6d8130805d636baf
행 SHA-256 8ef44ad16ad6a458f0e8cbb77e3b6fcf0d96d25d169e66aa7edbe573c1747c98
Source schedule candidates · KOR · kepco_planned

154kV 고옥-득량 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2028-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_3913ce412993c662

Sources EV-696525cf342a21f11988671a
Evidence SHA-256 e4d8655cb49c5c8f77b6c2ac55ae0b469abeae737c4174db6d8130805d636baf
행 SHA-256 8ef44ad16ad6a458f0e8cbb77e3b6fcf0d96d25d169e66aa7edbe573c1747c98
Source schedule candidates · KOR · kepco_planned

154kV 고옥-득량 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2026-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_3913ce412993c662

Sources EV-696525cf342a21f11988671a
Evidence SHA-256 e4d8655cb49c5c8f77b6c2ac55ae0b469abeae737c4174db6d8130805d636baf
행 SHA-256 8ef44ad16ad6a458f0e8cbb77e3b6fcf0d96d25d169e66aa7edbe573c1747c98
Source schedule candidates · KOR · kepco_planned

154kV 고옥-득량 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2026-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_3913ce412993c662

Sources EV-696525cf342a21f11988671a
Evidence SHA-256 e4d8655cb49c5c8f77b6c2ac55ae0b469abeae737c4174db6d8130805d636baf
행 SHA-256 8ef44ad16ad6a458f0e8cbb77e3b6fcf0d96d25d169e66aa7edbe573c1747c98
Source schedule candidates · KOR · kepco_planned

154kV 고옥-득량 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_3913ce412993c662

Sources EV-696525cf342a21f11988671a
Evidence SHA-256 e4d8655cb49c5c8f77b6c2ac55ae0b469abeae737c4174db6d8130805d636baf
행 SHA-256 8ef44ad16ad6a458f0e8cbb77e3b6fcf0d96d25d169e66aa7edbe573c1747c98
Source schedule candidates · KOR · kepco_planned

154kV 고옥-득량 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2025-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_3913ce412993c662

Sources EV-696525cf342a21f11988671a
Evidence SHA-256 e4d8655cb49c5c8f77b6c2ac55ae0b469abeae737c4174db6d8130805d636baf
행 SHA-256 8ef44ad16ad6a458f0e8cbb77e3b6fcf0d96d25d169e66aa7edbe573c1747c98
Source schedule candidates · KOR · kepco_planned

154kV 고옥-득량 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2028-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_3913ce412993c662

Sources EV-696525cf342a21f11988671a
Evidence SHA-256 e4d8655cb49c5c8f77b6c2ac55ae0b469abeae737c4174db6d8130805d636baf
행 SHA-256 8ef44ad16ad6a458f0e8cbb77e3b6fcf0d96d25d169e66aa7edbe573c1747c98
Source schedule candidates · KOR · kepco_planned

154kV 고옥-득량 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2025-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233621|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_3913ce412993c662

Sources EV-696525cf342a21f11988671a
Evidence SHA-256 e4d8655cb49c5c8f77b6c2ac55ae0b469abeae737c4174db6d8130805d636baf
행 SHA-256 8ef44ad16ad6a458f0e8cbb77e3b6fcf0d96d25d169e66aa7edbe573c1747c98
Source snapshots by date · KOR · kepco_planned

154kV 고옥-득량 지중T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_3913ce412993c662
stable_project_idkproj_933223e330b41e2a
source_key202609|233621|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 고옥-득량 지중송전선로 건설사업
project_name_detail154kV 고옥-득량 지중T/L 건설사업
region_summary_raw전남광주통합특별시 고흥군등 2 지역
equipment_type_raw지중송전
headquarters_raw중부건설본부
office_raw광주전남건설지사
section_fields
Project purpose
  • 고흥S/S 단일계통 보강 및 분산형전원 연계
Project region
  • 전남광주통합특별시 고흥군,보성군
Project period
  • 2021.07~2028.10
사업 규모
  • 154KV XLPE 2,000㎟ X 2C(D) - 8.7KM
담당 사업소
  • 중부건설본부/광주전남건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 실시설계: 설계담당자: [redacted]
[진행경과] □ '23.04 : 제10차 장기 송변전설비계획 반영 □ '25.07 : 기본설계 완료 □ '25.09 : 준공목표 변경요청 [계통운영부, `26.02→`28.10] [향후계획] □ '26.09 : 실시설계 완료 □ '26.12 : 공사 착공 □ '28.10 : 공사 준공
future_plan_redacted□ 향후계획 [진행경과] □ '23.04 : 제10차 장기 송변전설비계획 반영 □ '25.07 : 기본설계 완료 □ '25.09 : 준공목표 변경요청 [계통운영부, `26.02→`28.10] [향후계획] □ '26.09 : 실시설계 완료 □ '26.12 : 공사 착공 □ '28.10 : 공사 준공
attachment_count0
source_detail_sha256e4d8655cb49c5c8f77b6c2ac55ae0b469abeae737c4174db6d8130805d636baf
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|233621|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_3913ce412993c662

Sources EV-696525cf342a21f11988671a
Evidence SHA-256 e4d8655cb49c5c8f77b6c2ac55ae0b469abeae737c4174db6d8130805d636baf
행 SHA-256 8ef44ad16ad6a458f0e8cbb77e3b6fcf0d96d25d169e66aa7edbe573c1747c98
Source snapshots by date · KOR · kepco_planned

154kV 고옥-득량 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_933223e330b41e2a
stable_project_keyprjtDef:233621:ESB
project_definition233621
first_region_codeESB
manual_source_formatfalse
project_name154kV 고옥-득량 지중T/L 건설사업
project_name_list154kV 고옥-득량 지중송전선로 건설사업
purpose고흥S/S 단일계통 보강 및 분산형전원 연계
project_region_detail전남광주통합특별시 고흥군,보성군
project_period_raw2021.07~2028.10
project_scale_raw154KV XLPE 2,000㎟ X 2C(D) - 8.7KM
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type지중송전
headquarters중부건설본부
office광주전남건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_3913ce412993c662
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_933223e330b41e2a

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_933223e330b41e2a

Sources EV-8f8c95fcbe47ca8c03278245
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 0b9ce67bd6581d63d3c2fd8593e838dc6195aaf778d3a485013a0408c5f1fb80

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel