Power assets and projects · KOR · kepco_planned

154kV 봉화#3분기T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-c0744b36c198341dec2d5e81
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_16ce4747c4d427b8
stable_project_keyprjtDef:232647:ESB
project_definition232647
first_region_codeESB
manual_source_formatfalse
project_name154kV 봉화#3분기T/L 건설사업
project_name_list154kV 봉화#3분기 송전선로 건설사업
purpose봉화지역 신재생전원 접속용량 확보
project_region_detail경상북도 봉화군
project_period_raw
project_scale_rawACSR 330㎟ × S × 4C, 약 7KM
responsible_office_raw남부건설본부/대구경북건설지사
equipment_type가공송전
headquarters남부건설본부
office대구경북건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_3426aa90952dd242
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_16ce4747c4d427b8

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_16ce4747c4d427b8

Sources EV-c0744b36c198341dec2d5e81
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 5eedee10d701ad188df9ea42fe57cd0961c9d38ec986c26e4a78e4f3f50b42ee
Source snapshots by date · KOR · kepco_planned

154kV 봉화#3분기T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_3426aa90952dd242
stable_project_idkproj_16ce4747c4d427b8
source_key202609|232647|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 봉화#3분기 송전선로 건설사업
project_name_detail154kV 봉화#3분기T/L 건설사업
region_summary_raw경상북도 봉화군등 1 지역
equipment_type_raw가공송전
headquarters_raw남부건설본부
office_raw대구경북건설지사
section_fields
Project purpose
  • 봉화지역 신재생전원 접속용량 확보
Project region
  • 경상북도 봉화군
Project period
사업 규모
  • ACSR 330㎟ × S × 4C, 약 7KM
담당 사업소
  • 남부건설본부/대구경북건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
future_plan_redacted□ 향후계획
attachment_count0
source_detail_sha25653a3cf2c0fa352d5762af1559daa7eb42a3d40c1327d7f0275366aaa20b2a956
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232647|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_3426aa90952dd242

Sources EV-73e3639fa3d849644c2627f4
Evidence SHA-256 53a3cf2c0fa352d5762af1559daa7eb42a3d40c1327d7f0275366aaa20b2a956
행 SHA-256 a1b5e4638092b1529fdc623911c6a992a5f5f2e172d000df551317f3a5b385e4
Source snapshots by date · KOR · kepco_planned

154kV 봉화#3분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_16ce4747c4d427b8
stable_project_keyprjtDef:232647:ESB
project_definition232647
first_region_codeESB
manual_source_formatfalse
project_name154kV 봉화#3분기T/L 건설사업
project_name_list154kV 봉화#3분기 송전선로 건설사업
purpose봉화지역 신재생전원 접속용량 확보
project_region_detail경상북도 봉화군
project_period_raw
project_scale_rawACSR 330㎟ × S × 4C, 약 7KM
responsible_office_raw남부건설본부/대구경북건설지사
equipment_type가공송전
headquarters남부건설본부
office대구경북건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_3426aa90952dd242
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_16ce4747c4d427b8

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_16ce4747c4d427b8

Sources EV-c0744b36c198341dec2d5e81
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 5eedee10d701ad188df9ea42fe57cd0961c9d38ec986c26e4a78e4f3f50b42ee

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel