Power assets and projects · USA · eia860m

4001 and 2510 ClearVista Solar and Wind / CVPV

Generator · Cancelled or postponed

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)5 MWOriginal source column definition · Generator · Canceled or Postponed
As-of date 2026-08
Sources EV-188b7f3a651b45e64fd86f69
Net Summer Capacity (MW)5 MWOriginal source column definition · Generator · Canceled or Postponed
As-of date 2026-08
Sources EV-188b7f3a651b45e64fd86f69
Net Winter Capacity (MW)5 MWOriginal source column definition · Generator · Canceled or Postponed
As-of date 2026-08
Sources EV-188b7f3a651b45e64fd86f69
Detailed source fields
Original source fieldPublished value or condition
Entity ID58792
Entity NameClearVista Energy LLC
Plant ID58922
Plant Name4001 and 2510 ClearVista Solar and Wind
Google MapMap
Bing MapMap
Plant StateCA
CountyKern
Balancing Authority CodeCISO
SectorIPP Non-CHP
Generator IDCVPV
Nameplate Capacity (MW)5
Net Summer Capacity (MW)5
Net Winter Capacity (MW)5
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Latitude35.106389
Longitude-118.3928
Original textCanceled or Postponed
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idCanceled or Postponed:851

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Canceled or Postponed:851

Sources EV-188b7f3a651b45e64fd86f69
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 d7fc615e89cae8e4ef3e6ceb4a2fd476e2abbeafbf96325d79c685168a4bbf13

Usage terms US government public domain

Source snapshots by date · USA · eia860m

4001 and 2510 ClearVista Solar and Wind / CVPV

Generator · Cancelled or postponed

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID58792
Entity NameClearVista Energy LLC
Plant ID58922
Plant Name4001 and 2510 ClearVista Solar and Wind
Google MapMap
Bing MapMap
Plant StateCA
CountyKern
Balancing Authority CodeCISO
SectorIPP Non-CHP
Generator IDCVPV
Nameplate Capacity (MW)5
Net Summer Capacity (MW)5
Net Winter Capacity (MW)5
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Latitude35.106389
Longitude-118.3928
Original textCanceled or Postponed
source_record_idCanceled or Postponed:851

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Canceled or Postponed:851

Sources EV-188b7f3a651b45e64fd86f69
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 d7fc615e89cae8e4ef3e6ceb4a2fd476e2abbeafbf96325d79c685168a4bbf13

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel