Power assets and projects · USA · eia860m

59th Street / GT1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)17.1 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-6725ed7f69e7a6b8394ac459
Net Summer Capacity (MW)14.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-6725ed7f69e7a6b8394ac459
Net Winter Capacity (MW)16.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-6725ed7f69e7a6b8394ac459
Detailed source fields
Original source fieldPublished value or condition
Entity ID4226
Entity NameConsolidated Edison Co-NY Inc
Plant ID2503
Plant Name59th Street
Google MapMap
Bing MapMap
Plant StateNY
CountyNew York
Balancing Authority CodeNYIS
SectorElectric Utility
Generator IDGT1
Nameplate Capacity (MW)17.1
Net Summer Capacity (MW)14.5
Net Winter Capacity (MW)16.5
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Operating Month6
Operating Year1969
Status(OP) Operating
Latitude40.771285
Longitude-73.99115
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:3761

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:3756

Sources EV-dc196964024669d9dee3c3ed
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 57a70a6076ddfbdf259b9201d5d438de0804b0141bf22edb8d6ac712eee3973d

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:3761

Sources EV-6725ed7f69e7a6b8394ac459
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 f7bbd90b4c1636702be680e76f041e42acaeef27ed4aa1aedb6b0cd7a1d47f15

Usage terms US government public domain

Source snapshots by date · USA · eia860

59th Street / GT1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID4226
Utility NameConsolidated Edison Co-NY Inc
Plant Code2503
Plant Name59th Street
StateNY
CountyNew York
Generator IDGT1
TechnologyNatural Gas Fired Combustion Turbine
Prime MoverGT
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)17.1
Nameplate Power Factor0.91
Summer Capacity (MW)14.5
Winter Capacity (MW)16.5
Minimum Load (MW)3
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month6
Operating Year1969
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1NG
Energy Source 2KER
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full Load1H
Multiple Fuels?Y
Cofire Fuels?N
Switch Between Oil and Natural Gas?Y
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:3756

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:3756

Sources EV-dc196964024669d9dee3c3ed
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 57a70a6076ddfbdf259b9201d5d438de0804b0141bf22edb8d6ac712eee3973d

Usage terms US government public domain

Source snapshots by date · USA · eia860m

59th Street / GT1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID4226
Entity NameConsolidated Edison Co-NY Inc
Plant ID2503
Plant Name59th Street
Google MapMap
Bing MapMap
Plant StateNY
CountyNew York
Balancing Authority CodeNYIS
SectorElectric Utility
Generator IDGT1
Nameplate Capacity (MW)17.1
Net Summer Capacity (MW)14.5
Net Winter Capacity (MW)16.5
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Operating Month6
Operating Year1969
Status(OP) Operating
Latitude40.771285
Longitude-73.99115
Original text(OP) Operating
source_record_idOperating:3761

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:3761

Sources EV-6725ed7f69e7a6b8394ac459
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 f7bbd90b4c1636702be680e76f041e42acaeef27ed4aa1aedb6b0cd7a1d47f15

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel