POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 33items · current page 1–33 · Source records, not unique facilities.

Power assets and projects · AUS · aemo_generation

Banksia Solar Farm

Generator · committed conditional

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW DC)4.5 MWdcOriginal source column definition · Generation-register unit · Committed*
As-of date 2026-07-31
Sources EV-3419e8b89313511cf8cad278
Unit Capacity (MW AC)4.4 MWacOriginal source column definition · Generation-register unit · Committed*
As-of date 2026-07-31
Sources EV-3419e8b89313511cf8cad278
Aggregated Nameplate Capacity (MW DC)72 MWdcOriginal source column definition · Generation-register unit · Committed*
As-of date 2026-07-31
Sources EV-3419e8b89313511cf8cad278
Aggregated Nameplate Capacity (MW AC)70.4 MWacOriginal source column definition · Generation-register unit · Committed*
As-of date 2026-07-31
Sources EV-3419e8b89313511cf8cad278
Detailed source fields
Original source fieldPublished value or condition
Survey ID2578
Site NameBanksia Solar Farm
Site OwnerVenn Energy Pty / Banksia Solar Project Pty Ltd
RegionQLD1
Max Site Capacity (AC)60
Gen Info Unit ID257801
Unit NameBSF_GU1
Technology TypeSolar PV
Technology DetailSingle Axis Tracking
Dispatch TypeSemi-scheduled
Unit Count16
Unit Capacity (MW DC)4.5
Unit Capacity (MW AC)4.4
Aggregated Nameplate Capacity (MW DC)72
Aggregated Nameplate Capacity (MW AC)70.4
Commitment StatusCommitted*
Full Commercial Use Date2027-12-16T00:00:00
Expected Closure Year2057
Survey Last Requested Date2026-12-05T00:00:00
Survey Latest Update Date2026-05-19T14:29:33
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textCommitted*
source_record_idGenerator Information:54

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:54

Sources EV-3419e8b89313511cf8cad278
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 0d777aacea2cbcf69b3abda970afc6a6910a1d25621571e4b6732a46e5c3187f

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:27

Sources EV-81c361d0513abb7faa1b72d1
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 23a2ce16fb0e448dbdb565ff4a9c15b0c0fb0d81f3913ee7b6819956ccb685ad

Usage terms AEMO general copyright permission subject to exceptions

Source snapshots by date · AUS · aemo_generation

Banksia Solar Farm

Generation-register unit · committed conditional

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Survey ID2578
Site NameBanksia Solar Farm
Site OwnerVenn Energy Pty / Banksia Solar Project Pty Ltd
RegionQLD1
Max Site Capacity (AC)60
Gen Info Unit ID257801
Unit NameBSF_GU1
Technology TypeSolar PV
Technology DetailSingle Axis Tracking
Dispatch TypeSemi-scheduled
Unit Count16
Unit Capacity (MW DC)4.5
Unit Capacity (MW AC)4.4
Aggregated Nameplate Capacity (MW DC)72
Aggregated Nameplate Capacity (MW AC)70.4
Commitment StatusCommitted*
Full Commercial Use Date2027-12-16T00:00:00
Expected Closure Year2057
Survey Last Requested Date2026-12-05T00:00:00
Survey Latest Update Date2026-05-19T14:29:33
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textCommitted*
source_record_idGenerator Information:54

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:54

Sources EV-3419e8b89313511cf8cad278
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 0d777aacea2cbcf69b3abda970afc6a6910a1d25621571e4b6732a46e5c3187f

Usage terms AEMO general copyright permission subject to exceptions

Source snapshots by date · AUS · aemo_closure

Banksia Solar Farm

Generation-register unit · committed conditional

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
RegionQLD1
AEMO Survey ID2578
Gen Info Unit ID257801
Site NameBanksia Solar Farm
Commitment StatusCommitted*
Expected Closure Year2057
Survey Latest Update Date2026-05-19T14:29:33
Publication Date2024-07-24T00:00:00
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textCommitted*
source_record_idExpected Closure Year:27

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:27

Sources EV-81c361d0513abb7faa1b72d1
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 23a2ce16fb0e448dbdb565ff4a9c15b0c0fb0d81f3913ee7b6819956ccb685ad

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Banksia Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity60 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-3419e8b89313511cf8cad278

측정·전망기간 Winter 2029

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:54

Sources EV-3419e8b89313511cf8cad278
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 0d777aacea2cbcf69b3abda970afc6a6910a1d25621571e4b6732a46e5c3187f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Banksia Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity58.8 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-3419e8b89313511cf8cad278

측정·전망기간 Summer Peak 2028-29

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:54

Sources EV-3419e8b89313511cf8cad278
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 0d777aacea2cbcf69b3abda970afc6a6910a1d25621571e4b6732a46e5c3187f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Banksia Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity60 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-3419e8b89313511cf8cad278

측정·전망기간 Summer Typical 2028-29

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:54

Sources EV-3419e8b89313511cf8cad278
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 0d777aacea2cbcf69b3abda970afc6a6910a1d25621571e4b6732a46e5c3187f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Banksia Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity0 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-3419e8b89313511cf8cad278

측정·전망기간 Summer Typical 2026-27

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:54

Sources EV-3419e8b89313511cf8cad278
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 0d777aacea2cbcf69b3abda970afc6a6910a1d25621571e4b6732a46e5c3187f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Banksia Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity58.8 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-3419e8b89313511cf8cad278

측정·전망기간 Summer Peak 2027-28

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:54

Sources EV-3419e8b89313511cf8cad278
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 0d777aacea2cbcf69b3abda970afc6a6910a1d25621571e4b6732a46e5c3187f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Banksia Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity60 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-3419e8b89313511cf8cad278

측정·전망기간 Summer Typical 2032-33

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:54

Sources EV-3419e8b89313511cf8cad278
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 0d777aacea2cbcf69b3abda970afc6a6910a1d25621571e4b6732a46e5c3187f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Banksia Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity60 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-3419e8b89313511cf8cad278

측정·전망기간 Summer Typical 2029-30

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:54

Sources EV-3419e8b89313511cf8cad278
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 0d777aacea2cbcf69b3abda970afc6a6910a1d25621571e4b6732a46e5c3187f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Banksia Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity60 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-3419e8b89313511cf8cad278

측정·전망기간 Winter 2030

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:54

Sources EV-3419e8b89313511cf8cad278
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 0d777aacea2cbcf69b3abda970afc6a6910a1d25621571e4b6732a46e5c3187f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Banksia Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity60 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-3419e8b89313511cf8cad278

측정·전망기간 Winter 2032

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:54

Sources EV-3419e8b89313511cf8cad278
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 0d777aacea2cbcf69b3abda970afc6a6910a1d25621571e4b6732a46e5c3187f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Banksia Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity60 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-3419e8b89313511cf8cad278

측정·전망기간 Winter 2035

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:54

Sources EV-3419e8b89313511cf8cad278
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 0d777aacea2cbcf69b3abda970afc6a6910a1d25621571e4b6732a46e5c3187f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Banksia Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity60 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-3419e8b89313511cf8cad278

측정·전망기간 Summer Typical 2035-36

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:54

Sources EV-3419e8b89313511cf8cad278
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 0d777aacea2cbcf69b3abda970afc6a6910a1d25621571e4b6732a46e5c3187f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Banksia Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity58.8 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-3419e8b89313511cf8cad278

측정·전망기간 Summer Peak 2029-30

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:54

Sources EV-3419e8b89313511cf8cad278
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 0d777aacea2cbcf69b3abda970afc6a6910a1d25621571e4b6732a46e5c3187f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Banksia Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity58.8 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-3419e8b89313511cf8cad278

측정·전망기간 Summer Peak 2034-35

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:54

Sources EV-3419e8b89313511cf8cad278
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 0d777aacea2cbcf69b3abda970afc6a6910a1d25621571e4b6732a46e5c3187f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Banksia Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity0 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-3419e8b89313511cf8cad278

측정·전망기간 Winter 2026

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:54

Sources EV-3419e8b89313511cf8cad278
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 0d777aacea2cbcf69b3abda970afc6a6910a1d25621571e4b6732a46e5c3187f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Banksia Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity58.8 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-3419e8b89313511cf8cad278

측정·전망기간 Summer Peak 2031-32

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:54

Sources EV-3419e8b89313511cf8cad278
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 0d777aacea2cbcf69b3abda970afc6a6910a1d25621571e4b6732a46e5c3187f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Banksia Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity60 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-3419e8b89313511cf8cad278

측정·전망기간 Summer Typical 2034-35

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:54

Sources EV-3419e8b89313511cf8cad278
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 0d777aacea2cbcf69b3abda970afc6a6910a1d25621571e4b6732a46e5c3187f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Banksia Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity58.8 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-3419e8b89313511cf8cad278

측정·전망기간 Summer Peak 2033-34

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:54

Sources EV-3419e8b89313511cf8cad278
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 0d777aacea2cbcf69b3abda970afc6a6910a1d25621571e4b6732a46e5c3187f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Banksia Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity58.8 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-3419e8b89313511cf8cad278

측정·전망기간 Summer Peak 2030-31

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:54

Sources EV-3419e8b89313511cf8cad278
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 0d777aacea2cbcf69b3abda970afc6a6910a1d25621571e4b6732a46e5c3187f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Banksia Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity0 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-3419e8b89313511cf8cad278

측정·전망기간 Winter 2027

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:54

Sources EV-3419e8b89313511cf8cad278
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 0d777aacea2cbcf69b3abda970afc6a6910a1d25621571e4b6732a46e5c3187f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Banksia Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity60 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-3419e8b89313511cf8cad278

측정·전망기간 Winter 2033

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:54

Sources EV-3419e8b89313511cf8cad278
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 0d777aacea2cbcf69b3abda970afc6a6910a1d25621571e4b6732a46e5c3187f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Banksia Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity60 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-3419e8b89313511cf8cad278

측정·전망기간 Winter 2028

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:54

Sources EV-3419e8b89313511cf8cad278
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 0d777aacea2cbcf69b3abda970afc6a6910a1d25621571e4b6732a46e5c3187f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Banksia Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity60 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-3419e8b89313511cf8cad278

측정·전망기간 Winter 2031

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:54

Sources EV-3419e8b89313511cf8cad278
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 0d777aacea2cbcf69b3abda970afc6a6910a1d25621571e4b6732a46e5c3187f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Banksia Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity58.8 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-3419e8b89313511cf8cad278

측정·전망기간 Summer Peak 2035-36

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:54

Sources EV-3419e8b89313511cf8cad278
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 0d777aacea2cbcf69b3abda970afc6a6910a1d25621571e4b6732a46e5c3187f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Banksia Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity60 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-3419e8b89313511cf8cad278

측정·전망기간 Summer Typical 2031-32

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:54

Sources EV-3419e8b89313511cf8cad278
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 0d777aacea2cbcf69b3abda970afc6a6910a1d25621571e4b6732a46e5c3187f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Banksia Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity60 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-3419e8b89313511cf8cad278

측정·전망기간 Summer Typical 2030-31

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:54

Sources EV-3419e8b89313511cf8cad278
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 0d777aacea2cbcf69b3abda970afc6a6910a1d25621571e4b6732a46e5c3187f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Banksia Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity60 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-3419e8b89313511cf8cad278

측정·전망기간 Winter 2034

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:54

Sources EV-3419e8b89313511cf8cad278
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 0d777aacea2cbcf69b3abda970afc6a6910a1d25621571e4b6732a46e5c3187f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Banksia Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity60 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-3419e8b89313511cf8cad278

측정·전망기간 Summer Typical 2033-34

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:54

Sources EV-3419e8b89313511cf8cad278
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 0d777aacea2cbcf69b3abda970afc6a6910a1d25621571e4b6732a46e5c3187f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Banksia Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity60 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-3419e8b89313511cf8cad278

측정·전망기간 Summer Typical 2027-28

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:54

Sources EV-3419e8b89313511cf8cad278
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 0d777aacea2cbcf69b3abda970afc6a6910a1d25621571e4b6732a46e5c3187f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Banksia Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity0 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-3419e8b89313511cf8cad278

측정·전망기간 Summer Peak 2026-27

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:54

Sources EV-3419e8b89313511cf8cad278
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 0d777aacea2cbcf69b3abda970afc6a6910a1d25621571e4b6732a46e5c3187f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Banksia Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity58.8 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-3419e8b89313511cf8cad278

측정·전망기간 Summer Peak 2032-33

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:54

Sources EV-3419e8b89313511cf8cad278
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 0d777aacea2cbcf69b3abda970afc6a6910a1d25621571e4b6732a46e5c3187f

Usage terms AEMO general copyright permission subject to exceptions

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel