Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 2items · current page 1–2 · Source records, not unique facilities.

Power assets and projects · AUS · aemo_generation

Blair Athol Solar Power Station

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW AC)60 MWacOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-79d1c8288e4ebf388080923e
Aggregated Nameplate Capacity (MW AC)60 MWacOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-79d1c8288e4ebf388080923e
Detailed source fields
Original source fieldPublished value or condition
Survey ID2042
Site NameBlair Athol Solar Power Station
Site OwnerTerraCom Ltd
RegionQLD1
Max Site Capacity (AC)60
Gen Info Unit ID204201
Unit NameBlair At
Technology TypeSolar PV
Technology DetailFixed
Dispatch TypeSemi-scheduled
Unit Count1
Unit Capacity (MW AC)60
Aggregated Nameplate Capacity (MW AC)60
Commitment StatusPublicly Announced
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2025-11-27T12:28:59
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textPublicly Announced
source_record_idGenerator Information:120

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:120

Sources EV-79d1c8288e4ebf388080923e
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 69705c7634d585db92289b5b9321611328415f27a2fe178dafe2b44aedfd75c6

Usage terms AEMO general copyright permission subject to exceptions

Source snapshots by date · AUS · aemo_generation

Blair Athol Solar Power Station

Generation-register unit · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Survey ID2042
Site NameBlair Athol Solar Power Station
Site OwnerTerraCom Ltd
RegionQLD1
Max Site Capacity (AC)60
Gen Info Unit ID204201
Unit NameBlair At
Technology TypeSolar PV
Technology DetailFixed
Dispatch TypeSemi-scheduled
Unit Count1
Unit Capacity (MW AC)60
Aggregated Nameplate Capacity (MW AC)60
Commitment StatusPublicly Announced
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2025-11-27T12:28:59
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textPublicly Announced
source_record_idGenerator Information:120

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:120

Sources EV-79d1c8288e4ebf388080923e
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 69705c7634d585db92289b5b9321611328415f27a2fe178dafe2b44aedfd75c6

Usage terms AEMO general copyright permission subject to exceptions

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel