POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 33items · current page 1–33 · Source records, not unique facilities.
Power assets and projects · AUS · aemo_generation Snapper Point Power Station Generator · Operations
Metric or condition Source value Basis, scope and stage Unit Capacity (MW AC) 30.8 MWac Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-ce488d1671c077923136b5c3 Aggregated Nameplate Capacity (MW AC) 30.8 MWac Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-ce488d1671c077923136b5c3
Detailed source fields Original source field Published value or condition Survey ID 1532 Site Name Snapper Point Power Station Site Owner Port Adelaide Energy Pty Ltd Region SA1 Max Site Capacity (AC) 150.4 Gen Info Unit ID 153203 Unit Name Snap 2 Technology Type Gas Turbine Technology Detail OCGT Gas Turbine Fuel Type Natural Gas DUID SNAPPER1 Dispatch Type Scheduled Unit Count 1 Unit Capacity (MW AC) 30.8 Aggregated Nameplate Capacity (MW AC) 30.8 Commitment Status In Service Expected Closure Year 2046 Survey Last Requested Date 2026-03-10T00:00:00 Survey Latest Update Date 2026-03-17T15:46:56 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Generator Information:1326
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 2items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1326
Sources EV-ce488d1671c077923136b5c3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1a0ef82b1f6c4a5d49ff5e544963a93a7c7444e4b3c0b46928bd29f4a9cc32a9 Usage terms AEMO general copyright permission subject to exceptions
aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:610
Sources EV-9867aeeff29325b0600e737d Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 334669f9974f39ea42fa1ad7567ab30153bf87a3c103d304ce45dc8ba2e4c533 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Survey ID 1532 Site Name Snapper Point Power Station Site Owner Port Adelaide Energy Pty Ltd Region SA1 Max Site Capacity (AC) 150.4 Gen Info Unit ID 153203 Unit Name Snap 2 Technology Type Gas Turbine Technology Detail OCGT Gas Turbine Fuel Type Natural Gas DUID SNAPPER1 Dispatch Type Scheduled Unit Count 1 Unit Capacity (MW AC) 30.8 Aggregated Nameplate Capacity (MW AC) 30.8 Commitment Status In Service Expected Closure Year 2046 Survey Last Requested Date 2026-03-10T00:00:00 Survey Latest Update Date 2026-03-17T15:46:56 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Generator Information:1326
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1326
Sources EV-ce488d1671c077923136b5c3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1a0ef82b1f6c4a5d49ff5e544963a93a7c7444e4b3c0b46928bd29f4a9cc32a9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Region SA1 AEMO Survey ID 1532 Gen Info Unit ID 153203 Site Name Snapper Point Power Station DUID SNAPPER1 Commitment Status In Service Expected Closure Year 2046 Survey Latest Update Date 2026-03-17T15:46:56 Publication Date 2024-07-24T00:00:00 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Expected Closure Year:610
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:610
Sources EV-9867aeeff29325b0600e737d Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 334669f9974f39ea42fa1ad7567ab30153bf87a3c103d304ce45dc8ba2e4c533 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 30 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ce488d1671c077923136b5c3 측정·전망기간 Winter 2032
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1326
Sources EV-ce488d1671c077923136b5c3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1a0ef82b1f6c4a5d49ff5e544963a93a7c7444e4b3c0b46928bd29f4a9cc32a9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 24.6 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ce488d1671c077923136b5c3 측정·전망기간 Summer Peak 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1326
Sources EV-ce488d1671c077923136b5c3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1a0ef82b1f6c4a5d49ff5e544963a93a7c7444e4b3c0b46928bd29f4a9cc32a9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 24.6 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ce488d1671c077923136b5c3 측정·전망기간 Summer Peak 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1326
Sources EV-ce488d1671c077923136b5c3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1a0ef82b1f6c4a5d49ff5e544963a93a7c7444e4b3c0b46928bd29f4a9cc32a9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 24.6 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ce488d1671c077923136b5c3 측정·전망기간 Summer Peak 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1326
Sources EV-ce488d1671c077923136b5c3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1a0ef82b1f6c4a5d49ff5e544963a93a7c7444e4b3c0b46928bd29f4a9cc32a9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 30 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ce488d1671c077923136b5c3 측정·전망기간 Winter 2034
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1326
Sources EV-ce488d1671c077923136b5c3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1a0ef82b1f6c4a5d49ff5e544963a93a7c7444e4b3c0b46928bd29f4a9cc32a9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 27.62 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ce488d1671c077923136b5c3 측정·전망기간 Summer Typical 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1326
Sources EV-ce488d1671c077923136b5c3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1a0ef82b1f6c4a5d49ff5e544963a93a7c7444e4b3c0b46928bd29f4a9cc32a9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 30 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ce488d1671c077923136b5c3 측정·전망기간 Winter 2033
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1326
Sources EV-ce488d1671c077923136b5c3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1a0ef82b1f6c4a5d49ff5e544963a93a7c7444e4b3c0b46928bd29f4a9cc32a9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 27.62 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ce488d1671c077923136b5c3 측정·전망기간 Summer Typical 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1326
Sources EV-ce488d1671c077923136b5c3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1a0ef82b1f6c4a5d49ff5e544963a93a7c7444e4b3c0b46928bd29f4a9cc32a9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 30 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ce488d1671c077923136b5c3 측정·전망기간 Winter 2031
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1326
Sources EV-ce488d1671c077923136b5c3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1a0ef82b1f6c4a5d49ff5e544963a93a7c7444e4b3c0b46928bd29f4a9cc32a9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 27.62 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ce488d1671c077923136b5c3 측정·전망기간 Summer Typical 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1326
Sources EV-ce488d1671c077923136b5c3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1a0ef82b1f6c4a5d49ff5e544963a93a7c7444e4b3c0b46928bd29f4a9cc32a9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 30 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ce488d1671c077923136b5c3 측정·전망기간 Winter 2028
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1326
Sources EV-ce488d1671c077923136b5c3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1a0ef82b1f6c4a5d49ff5e544963a93a7c7444e4b3c0b46928bd29f4a9cc32a9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 30 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ce488d1671c077923136b5c3 측정·전망기간 Winter 2026
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1326
Sources EV-ce488d1671c077923136b5c3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1a0ef82b1f6c4a5d49ff5e544963a93a7c7444e4b3c0b46928bd29f4a9cc32a9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 27.62 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ce488d1671c077923136b5c3 측정·전망기간 Summer Typical 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1326
Sources EV-ce488d1671c077923136b5c3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1a0ef82b1f6c4a5d49ff5e544963a93a7c7444e4b3c0b46928bd29f4a9cc32a9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 30 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ce488d1671c077923136b5c3 측정·전망기간 Winter 2030
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1326
Sources EV-ce488d1671c077923136b5c3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1a0ef82b1f6c4a5d49ff5e544963a93a7c7444e4b3c0b46928bd29f4a9cc32a9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 24.6 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ce488d1671c077923136b5c3 측정·전망기간 Summer Peak 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1326
Sources EV-ce488d1671c077923136b5c3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1a0ef82b1f6c4a5d49ff5e544963a93a7c7444e4b3c0b46928bd29f4a9cc32a9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 27.62 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ce488d1671c077923136b5c3 측정·전망기간 Summer Typical 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1326
Sources EV-ce488d1671c077923136b5c3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1a0ef82b1f6c4a5d49ff5e544963a93a7c7444e4b3c0b46928bd29f4a9cc32a9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 27.62 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ce488d1671c077923136b5c3 측정·전망기간 Summer Typical 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1326
Sources EV-ce488d1671c077923136b5c3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1a0ef82b1f6c4a5d49ff5e544963a93a7c7444e4b3c0b46928bd29f4a9cc32a9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 30 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ce488d1671c077923136b5c3 측정·전망기간 Winter 2029
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1326
Sources EV-ce488d1671c077923136b5c3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1a0ef82b1f6c4a5d49ff5e544963a93a7c7444e4b3c0b46928bd29f4a9cc32a9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 27.62 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ce488d1671c077923136b5c3 측정·전망기간 Summer Typical 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1326
Sources EV-ce488d1671c077923136b5c3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1a0ef82b1f6c4a5d49ff5e544963a93a7c7444e4b3c0b46928bd29f4a9cc32a9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 27.62 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ce488d1671c077923136b5c3 측정·전망기간 Summer Typical 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1326
Sources EV-ce488d1671c077923136b5c3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1a0ef82b1f6c4a5d49ff5e544963a93a7c7444e4b3c0b46928bd29f4a9cc32a9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 27.62 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ce488d1671c077923136b5c3 측정·전망기간 Summer Typical 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1326
Sources EV-ce488d1671c077923136b5c3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1a0ef82b1f6c4a5d49ff5e544963a93a7c7444e4b3c0b46928bd29f4a9cc32a9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 24.6 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ce488d1671c077923136b5c3 측정·전망기간 Summer Peak 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1326
Sources EV-ce488d1671c077923136b5c3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1a0ef82b1f6c4a5d49ff5e544963a93a7c7444e4b3c0b46928bd29f4a9cc32a9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 24.6 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ce488d1671c077923136b5c3 측정·전망기간 Summer Peak 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1326
Sources EV-ce488d1671c077923136b5c3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1a0ef82b1f6c4a5d49ff5e544963a93a7c7444e4b3c0b46928bd29f4a9cc32a9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 24.6 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ce488d1671c077923136b5c3 측정·전망기간 Summer Peak 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1326
Sources EV-ce488d1671c077923136b5c3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1a0ef82b1f6c4a5d49ff5e544963a93a7c7444e4b3c0b46928bd29f4a9cc32a9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 27.62 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ce488d1671c077923136b5c3 측정·전망기간 Summer Typical 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1326
Sources EV-ce488d1671c077923136b5c3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1a0ef82b1f6c4a5d49ff5e544963a93a7c7444e4b3c0b46928bd29f4a9cc32a9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 24.6 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ce488d1671c077923136b5c3 측정·전망기간 Summer Peak 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1326
Sources EV-ce488d1671c077923136b5c3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1a0ef82b1f6c4a5d49ff5e544963a93a7c7444e4b3c0b46928bd29f4a9cc32a9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 24.6 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ce488d1671c077923136b5c3 측정·전망기간 Summer Peak 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1326
Sources EV-ce488d1671c077923136b5c3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1a0ef82b1f6c4a5d49ff5e544963a93a7c7444e4b3c0b46928bd29f4a9cc32a9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 24.6 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ce488d1671c077923136b5c3 측정·전망기간 Summer Peak 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1326
Sources EV-ce488d1671c077923136b5c3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1a0ef82b1f6c4a5d49ff5e544963a93a7c7444e4b3c0b46928bd29f4a9cc32a9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 30 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ce488d1671c077923136b5c3 측정·전망기간 Winter 2027
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1326
Sources EV-ce488d1671c077923136b5c3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1a0ef82b1f6c4a5d49ff5e544963a93a7c7444e4b3c0b46928bd29f4a9cc32a9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 30 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ce488d1671c077923136b5c3 측정·전망기간 Winter 2035
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1326
Sources EV-ce488d1671c077923136b5c3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1a0ef82b1f6c4a5d49ff5e544963a93a7c7444e4b3c0b46928bd29f4a9cc32a9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset