POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · AUS · aemo_generation

Barcaldine Remote Community Solar Farm

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW DC)2.5 MWdcOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-31de49030e00ff1082db5a0d
Unit Capacity (MW AC)2 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-31de49030e00ff1082db5a0d
Aggregated Nameplate Capacity (MW DC)25 MWdcOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-31de49030e00ff1082db5a0d
Aggregated Nameplate Capacity (MW AC)20 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-31de49030e00ff1082db5a0d
Detailed source fields
Original source fieldPublished value or condition
Survey ID1389
Site NameBarcaldine Remote Community Solar Farm
Site OwnerBarcaldine Remote Community Solar Farm Pty Ltd
RegionQLD1
Max Site Capacity (AC)20
Gen Info Unit ID138901
Unit NameBarcaldine Remote Community Solar Farm:1
Technology TypeSolar PV
Technology DetailSingle Axis Tracking
DUIDBARCSF1
Dispatch TypeNon-scheduled
Unit Count10
Unit Capacity (MW DC)2.5
Unit Capacity (MW AC)2
Aggregated Nameplate Capacity (MW DC)25
Aggregated Nameplate Capacity (MW AC)20
Commitment StatusIn Service
Expected Closure Year2049
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-04-02T13:43:35
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idGenerator Information:59

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:59

Sources EV-31de49030e00ff1082db5a0d
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 7c3b3f34d8c9fe6a4c553a33114ec1f7bfcc3152c2d61e9c5d4a762c5d718352

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:31

Sources EV-068b0218811ace7c5421e61e
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 f32a5285c0144eb36da62bcd774377b02427c5b5e011db373ce26002490fefa1

Usage terms AEMO general copyright permission subject to exceptions

Source snapshots by date · AUS · aemo_generation

Barcaldine Remote Community Solar Farm

Generation-register unit · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Survey ID1389
Site NameBarcaldine Remote Community Solar Farm
Site OwnerBarcaldine Remote Community Solar Farm Pty Ltd
RegionQLD1
Max Site Capacity (AC)20
Gen Info Unit ID138901
Unit NameBarcaldine Remote Community Solar Farm:1
Technology TypeSolar PV
Technology DetailSingle Axis Tracking
DUIDBARCSF1
Dispatch TypeNon-scheduled
Unit Count10
Unit Capacity (MW DC)2.5
Unit Capacity (MW AC)2
Aggregated Nameplate Capacity (MW DC)25
Aggregated Nameplate Capacity (MW AC)20
Commitment StatusIn Service
Expected Closure Year2049
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-04-02T13:43:35
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idGenerator Information:59

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:59

Sources EV-31de49030e00ff1082db5a0d
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 7c3b3f34d8c9fe6a4c553a33114ec1f7bfcc3152c2d61e9c5d4a762c5d718352

Usage terms AEMO general copyright permission subject to exceptions

Source snapshots by date · AUS · aemo_closure

Barcaldine Remote Community Solar Farm

Generation-register unit · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
RegionQLD1
AEMO Survey ID1389
Gen Info Unit ID138901
Site NameBarcaldine Remote Community Solar Farm
DUIDBARCSF1
Commitment StatusIn Service
Expected Closure Year2049
Survey Latest Update Date2026-04-02T13:43:35
Publication Date2024-07-24T00:00:00
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idExpected Closure Year:31

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:31

Sources EV-068b0218811ace7c5421e61e
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 f32a5285c0144eb36da62bcd774377b02427c5b5e011db373ce26002490fefa1

Usage terms AEMO general copyright permission subject to exceptions

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel