POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 33items · current page 1–33 · Source records, not unique facilities.
Power assets and projects · AUS · aemo_generation Upper Tumut Generator · Operations
Metric or condition Source value Basis, scope and stage Unit Capacity (MW AC) 72 MWac Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-0a203be0d95eb320c19e12d8 Aggregated Nameplate Capacity (MW AC) 72 MWac Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-0a203be0d95eb320c19e12d8
Detailed source fields Original source field Published value or condition Survey ID 1217 Site Name Upper Tumut Site Owner Snowy Hydro Ltd Region NSW1 Max Site Capacity (AC) 665 Gen Info Unit ID 121708 Unit Name Upper Tumut:8 Technology Type Hydro Technology Detail Dam DUID UPPTUMUT Dispatch Type Scheduled Unit Count 1 Unit Capacity (MW AC) 72 Aggregated Nameplate Capacity (MW AC) 72 Commitment Status In Service Expected Closure Year 2070 Survey Last Requested Date 2026-03-10T00:00:00 Survey Latest Update Date 2026-05-19T16:30:51 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Generator Information:1570
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 2items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1570
Sources EV-0a203be0d95eb320c19e12d8 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b871a918ce63e6375aa38984e0c8ef7853234fcdd477cc04e892303b8c8c2535 Usage terms AEMO general copyright permission subject to exceptions
aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:738
Sources EV-ca369a0a46027d11a89785c7 Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 d82d44a651f1298093c7e674fcf8e2938d3f4d87eaad497f7e78ed9fb06aa05d Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Survey ID 1217 Site Name Upper Tumut Site Owner Snowy Hydro Ltd Region NSW1 Max Site Capacity (AC) 665 Gen Info Unit ID 121708 Unit Name Upper Tumut:8 Technology Type Hydro Technology Detail Dam DUID UPPTUMUT Dispatch Type Scheduled Unit Count 1 Unit Capacity (MW AC) 72 Aggregated Nameplate Capacity (MW AC) 72 Commitment Status In Service Expected Closure Year 2070 Survey Last Requested Date 2026-03-10T00:00:00 Survey Latest Update Date 2026-05-19T16:30:51 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Generator Information:1570
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1570
Sources EV-0a203be0d95eb320c19e12d8 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b871a918ce63e6375aa38984e0c8ef7853234fcdd477cc04e892303b8c8c2535 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Region NSW1 AEMO Survey ID 1217 Gen Info Unit ID 121708 Site Name Upper Tumut DUID UPPTUMUT Commitment Status In Service Expected Closure Year 2070 Survey Latest Update Date 2026-05-19T16:30:51 Publication Date 2024-07-24T00:00:00 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Expected Closure Year:738
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:738
Sources EV-ca369a0a46027d11a89785c7 Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 d82d44a651f1298093c7e674fcf8e2938d3f4d87eaad497f7e78ed9fb06aa05d Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 73 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-0a203be0d95eb320c19e12d8 측정·전망기간 Summer Peak 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1570
Sources EV-0a203be0d95eb320c19e12d8 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b871a918ce63e6375aa38984e0c8ef7853234fcdd477cc04e892303b8c8c2535 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 73 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-0a203be0d95eb320c19e12d8 측정·전망기간 Winter 2027
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1570
Sources EV-0a203be0d95eb320c19e12d8 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b871a918ce63e6375aa38984e0c8ef7853234fcdd477cc04e892303b8c8c2535 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 73 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-0a203be0d95eb320c19e12d8 측정·전망기간 Summer Typical 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1570
Sources EV-0a203be0d95eb320c19e12d8 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b871a918ce63e6375aa38984e0c8ef7853234fcdd477cc04e892303b8c8c2535 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 73 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-0a203be0d95eb320c19e12d8 측정·전망기간 Winter 2034
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1570
Sources EV-0a203be0d95eb320c19e12d8 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b871a918ce63e6375aa38984e0c8ef7853234fcdd477cc04e892303b8c8c2535 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 73 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-0a203be0d95eb320c19e12d8 측정·전망기간 Winter 2033
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1570
Sources EV-0a203be0d95eb320c19e12d8 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b871a918ce63e6375aa38984e0c8ef7853234fcdd477cc04e892303b8c8c2535 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 73 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-0a203be0d95eb320c19e12d8 측정·전망기간 Summer Peak 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1570
Sources EV-0a203be0d95eb320c19e12d8 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b871a918ce63e6375aa38984e0c8ef7853234fcdd477cc04e892303b8c8c2535 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 73 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-0a203be0d95eb320c19e12d8 측정·전망기간 Summer Peak 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1570
Sources EV-0a203be0d95eb320c19e12d8 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b871a918ce63e6375aa38984e0c8ef7853234fcdd477cc04e892303b8c8c2535 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 73 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-0a203be0d95eb320c19e12d8 측정·전망기간 Summer Typical 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1570
Sources EV-0a203be0d95eb320c19e12d8 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b871a918ce63e6375aa38984e0c8ef7853234fcdd477cc04e892303b8c8c2535 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 73 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-0a203be0d95eb320c19e12d8 측정·전망기간 Summer Typical 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1570
Sources EV-0a203be0d95eb320c19e12d8 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b871a918ce63e6375aa38984e0c8ef7853234fcdd477cc04e892303b8c8c2535 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 73 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-0a203be0d95eb320c19e12d8 측정·전망기간 Winter 2026
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1570
Sources EV-0a203be0d95eb320c19e12d8 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b871a918ce63e6375aa38984e0c8ef7853234fcdd477cc04e892303b8c8c2535 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 73 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-0a203be0d95eb320c19e12d8 측정·전망기간 Summer Peak 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1570
Sources EV-0a203be0d95eb320c19e12d8 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b871a918ce63e6375aa38984e0c8ef7853234fcdd477cc04e892303b8c8c2535 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-0a203be0d95eb320c19e12d8 측정·전망기간 Summer Peak 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1570
Sources EV-0a203be0d95eb320c19e12d8 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b871a918ce63e6375aa38984e0c8ef7853234fcdd477cc04e892303b8c8c2535 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-0a203be0d95eb320c19e12d8 측정·전망기간 Summer Typical 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1570
Sources EV-0a203be0d95eb320c19e12d8 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b871a918ce63e6375aa38984e0c8ef7853234fcdd477cc04e892303b8c8c2535 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 73 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-0a203be0d95eb320c19e12d8 측정·전망기간 Summer Typical 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1570
Sources EV-0a203be0d95eb320c19e12d8 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b871a918ce63e6375aa38984e0c8ef7853234fcdd477cc04e892303b8c8c2535 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 73 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-0a203be0d95eb320c19e12d8 측정·전망기간 Winter 2035
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1570
Sources EV-0a203be0d95eb320c19e12d8 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b871a918ce63e6375aa38984e0c8ef7853234fcdd477cc04e892303b8c8c2535 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 73 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-0a203be0d95eb320c19e12d8 측정·전망기간 Summer Typical 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1570
Sources EV-0a203be0d95eb320c19e12d8 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b871a918ce63e6375aa38984e0c8ef7853234fcdd477cc04e892303b8c8c2535 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 73 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-0a203be0d95eb320c19e12d8 측정·전망기간 Winter 2032
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1570
Sources EV-0a203be0d95eb320c19e12d8 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b871a918ce63e6375aa38984e0c8ef7853234fcdd477cc04e892303b8c8c2535 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 73 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-0a203be0d95eb320c19e12d8 측정·전망기간 Winter 2029
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1570
Sources EV-0a203be0d95eb320c19e12d8 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b871a918ce63e6375aa38984e0c8ef7853234fcdd477cc04e892303b8c8c2535 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 73 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-0a203be0d95eb320c19e12d8 측정·전망기간 Winter 2028
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1570
Sources EV-0a203be0d95eb320c19e12d8 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b871a918ce63e6375aa38984e0c8ef7853234fcdd477cc04e892303b8c8c2535 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 73 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-0a203be0d95eb320c19e12d8 측정·전망기간 Summer Peak 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1570
Sources EV-0a203be0d95eb320c19e12d8 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b871a918ce63e6375aa38984e0c8ef7853234fcdd477cc04e892303b8c8c2535 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 73 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-0a203be0d95eb320c19e12d8 측정·전망기간 Summer Typical 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1570
Sources EV-0a203be0d95eb320c19e12d8 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b871a918ce63e6375aa38984e0c8ef7853234fcdd477cc04e892303b8c8c2535 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 73 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-0a203be0d95eb320c19e12d8 측정·전망기간 Winter 2031
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1570
Sources EV-0a203be0d95eb320c19e12d8 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b871a918ce63e6375aa38984e0c8ef7853234fcdd477cc04e892303b8c8c2535 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 73 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-0a203be0d95eb320c19e12d8 측정·전망기간 Summer Peak 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1570
Sources EV-0a203be0d95eb320c19e12d8 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b871a918ce63e6375aa38984e0c8ef7853234fcdd477cc04e892303b8c8c2535 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 73 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-0a203be0d95eb320c19e12d8 측정·전망기간 Summer Typical 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1570
Sources EV-0a203be0d95eb320c19e12d8 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b871a918ce63e6375aa38984e0c8ef7853234fcdd477cc04e892303b8c8c2535 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 73 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-0a203be0d95eb320c19e12d8 측정·전망기간 Summer Peak 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1570
Sources EV-0a203be0d95eb320c19e12d8 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b871a918ce63e6375aa38984e0c8ef7853234fcdd477cc04e892303b8c8c2535 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 73 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-0a203be0d95eb320c19e12d8 측정·전망기간 Summer Peak 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1570
Sources EV-0a203be0d95eb320c19e12d8 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b871a918ce63e6375aa38984e0c8ef7853234fcdd477cc04e892303b8c8c2535 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 73 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-0a203be0d95eb320c19e12d8 측정·전망기간 Summer Typical 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1570
Sources EV-0a203be0d95eb320c19e12d8 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b871a918ce63e6375aa38984e0c8ef7853234fcdd477cc04e892303b8c8c2535 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 73 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-0a203be0d95eb320c19e12d8 측정·전망기간 Summer Typical 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1570
Sources EV-0a203be0d95eb320c19e12d8 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b871a918ce63e6375aa38984e0c8ef7853234fcdd477cc04e892303b8c8c2535 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 73 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-0a203be0d95eb320c19e12d8 측정·전망기간 Summer Peak 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1570
Sources EV-0a203be0d95eb320c19e12d8 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b871a918ce63e6375aa38984e0c8ef7853234fcdd477cc04e892303b8c8c2535 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 73 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-0a203be0d95eb320c19e12d8 측정·전망기간 Winter 2030
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1570
Sources EV-0a203be0d95eb320c19e12d8 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b871a918ce63e6375aa38984e0c8ef7853234fcdd477cc04e892303b8c8c2535 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset