Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Relationship status: Identity match confirmed · same inherited record Related record power_source:6280045e3feb:power_asset:d146fc9ada95 · Relationship evidence
critical it design capacity · Campus · as published As-of date 2024-03-12 Sources EV-a7e7b8419fb2eafcd4b05126
Detailed source fields
Original source field
Published value or condition
esa_signed_period
2023-08
substation_voltage_kV
275
energization_reported_by
2024-03-12
exact_energization_date
Not obtained
contracted_supply_MW
Not obtained
inherited_batch
AIDC-GLOBAL-20261005-DATA-R1-FIX1
eligible_for_exact_contract_mw
false
Verification status
primary_statement
Change type
enriched
Contracting parties
Name
Yondr
Role
data_center_developer
Organization ID
Not obtained
Verification status
name_in_primary_source_not_registry_verified
Name
Tenaga Nasional Berhad
Role
electricity_supplier
Organization ID
Not obtained
Verification status
name_in_primary_source_not_registry_verified
Announcement expressly describes IT load, despite being in an ESA paragraph. Contract gross/grid MW is not disclosed. Displayed date March 12; release dateline March 13, 2024. 300 MW is critical IT campus design capacity, not ESA MW. Source announces campus substation energized without an exact event date.