Johor AI data center campus, first phase
data center project · Published statement
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| facility_capacity_unspecified | 100 MW | facility capacity unspecified · first campus phase · as published As-of date 2026-04-22 Sources EV-17a7599ca75d5d277635b404 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| collection_field_gaps |
|
| source_record_id | r1:power_source:a0605069d841:power_asset:70add91fdcec |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 2items
Data Source 2026-04-22 · Retrieved 2026-10-05
www.rackscentral.com
Source location inherited observation P018
Sources EV-a3e97b61b84fdd9b364c20daEvidence SHA-256 1d81d2f90398fc037cd08bf140b1838263863d82c71cdbd7ad17abdcc384da6d · raw_http_response
Data Source 2026-04-22 · Retrieved 2026-10-05
www.rackscentral.com
Source location article body
Sources EV-17a7599ca75d5d277635b404Evidence SHA-256 1d81d2f90398fc037cd08bf140b1838263863d82c71cdbd7ad17abdcc384da6d · raw_http_response
