POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · MYS · primary:a0605069d841259ae53f7583

Johor AI data center campus, first phase

Not obtained · Identity match confirmed

Relationship status: Identity match confirmed · same inherited record
Related record power_source:a0605069d841:power_asset:70add91fdcec · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idr1:power_source:a0605069d841:power_asset:70add91fdcec
to_kindr1_entity
to_idpower_source:a0605069d841:power_asset:70add91fdcec
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
www.rackscentral.com ↗

Data Source 2026-04-22 · Retrieved 2026-10-05

www.rackscentral.com

Source location inherited observation P018

Sources EV-a3e97b61b84fdd9b364c20da
Evidence SHA-256 1d81d2f90398fc037cd08bf140b1838263863d82c71cdbd7ad17abdcc384da6d · raw_http_response
Power assets and projects · MYS · primary:a0605069d841259ae53f7583

Johor AI data center campus, first phase

data center project · Published statement

Metric or conditionSource valueBasis, scope and stage
facility_capacity_unspecified100 MWfacility capacity unspecified · first campus phase · as published
As-of date 2026-04-22
Sources EV-17a7599ca75d5d277635b404
Detailed source fields
Original source fieldPublished value or condition
collection_field_gaps
  • fields
    • wue
    • water_supply_capacity
    • exact_connection_point
    • actual_energization_date
    reason
    No verified field-level original acquired for these attributes; null is not zero.
source_record_idr1:power_source:a0605069d841:power_asset:70add91fdcec

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
www.rackscentral.com ↗

Data Source 2026-04-22 · Retrieved 2026-10-05

www.rackscentral.com

Source location inherited observation P018

Sources EV-a3e97b61b84fdd9b364c20da
Evidence SHA-256 1d81d2f90398fc037cd08bf140b1838263863d82c71cdbd7ad17abdcc384da6d · raw_http_response
www.rackscentral.com ↗

Data Source 2026-04-22 · Retrieved 2026-10-05

www.rackscentral.com

Source location article body

Sources EV-17a7599ca75d5d277635b404
Evidence SHA-256 1d81d2f90398fc037cd08bf140b1838263863d82c71cdbd7ad17abdcc384da6d · raw_http_response
Power observations · MYS · primary:a0605069d841259ae53f7583

Johor AI data center campus, first phase

first campus phase · Official statement

Metric or conditionSource valueBasis, scope and stage
facility_capacity_unspecified100 MWfacility capacity unspecified · first campus phase · as published
As-of date 2026-04-22
Sources EV-a3e97b61b84fdd9b364c20da
Detailed source fields
Original source fieldPublished value or condition
Agreement typeESA
signed_announcement2026-04-22
term_rawlong-term
contracted_supply_MWNot obtained
inherited_batchAIDC-GLOBAL-20261005-DATA-R1-FIX1
eligible_for_exact_contract_mwfalse
Verification statusprimary_statement
Change typeenriched
Contracting parties
  • Name
    Racks Central
    Role
    customer
    Organization ID
    Not obtained
    Verification status
    name_in_primary_source_not_registry_verified
  • Name
    Tenaga Nasional Berhad
    Role
    electricity_supplier
    Organization ID
    Not obtained
    Verification status
    name_in_primary_source_not_registry_verified

ESA existence is confirmed, but 100MW modifies phase capacity rather than an explicit electricity-supply amount; IT versus gross basis is unspecified. Conservatively exclude from exact contract MW. Announcement describes ESA powering a 100 MW first phase. The number remains facility capacity unspecified, not reclassified as utility contract MW.

Sources, reference dates and retrieval dates 2items
www.rackscentral.com ↗

Data Source 2026-04-22 · Retrieved 2026-10-05

www.rackscentral.com

Source location inherited observation P018

Sources EV-a3e97b61b84fdd9b364c20da
Evidence SHA-256 1d81d2f90398fc037cd08bf140b1838263863d82c71cdbd7ad17abdcc384da6d · raw_http_response
www.rackscentral.com ↗

Data Source 2026-04-22 · Retrieved 2026-10-05

www.rackscentral.com

Source location article body

Sources EV-17a7599ca75d5d277635b404
Evidence SHA-256 1d81d2f90398fc037cd08bf140b1838263863d82c71cdbd7ad17abdcc384da6d · raw_http_response