Johor Sedenak Tech Park campus
data center project · Published statement
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| critical_it_design_capacity | 300 MW | critical it design capacity · Campus · as published As-of date 2024-03-12 Sources EV-320a492f9fbe459df8979322 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| collection_field_gaps |
|
| source_record_id | r1:power_source:6280045e3feb:power_asset:d146fc9ada95 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 2items
Data Source 2024-03-12 · Retrieved 2026-10-05
www.yondrgroup.com
Source location inherited observation P011
Sources EV-a7e7b8419fb2eafcd4b05126Evidence SHA-256 8437dde59563f1c5317ddaf109567c0d808cc371e011243d48937401ff0377bb · raw_http_response
Data Source 2024-03-12 · Retrieved 2026-10-05
www.yondrgroup.com
Source location article body
Sources EV-320a492f9fbe459df8979322Evidence SHA-256 8437dde59563f1c5317ddaf109567c0d808cc371e011243d48937401ff0377bb · raw_http_response