Alcemi Score Battery Energy Storage Facility
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-9815e69e948d8ce0a97ba395 |
| MW Increase / Decrease | 500 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-9815e69e948d8ce0a97ba395 |
| Cumulative Total Capacity (MW) | 500 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-9815e69e948d8ce0a97ba395 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Alcemi Score Battery Energy Storage Facility |
| Customer Name | ALCEMI STORAGE DEVELOPMENTS 5 LIMITED |
| Connection Site | ALCEMI SCORE BATTERY ENERGY STORAGE FACILITY 400KV SUBSTATION |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 500.00 |
| Cumulative Total Capacity (MW) | 500.00 |
| MW Effective From | 2029-10-31 |
| Project Status | Scoping |
| Agreement Type | Direct Connection |
| HOST TO | SHET |
| Plant Type | Energy Storage System |
| Project ID | a0l4L0000005izQQAQ |
| Project Number | PRO-001575 |
| Gate | 1 |
| Original text | Scoping |
| source_record_id | csv:row:50 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:50
Sources EV-9815e69e948d8ce0a97ba395Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 5bc37c9f9fb83048bc6acf8a496ff2f7afd9b58de8a7d9d9bb145cad12036932
Usage terms NESO Open Data Licence
