POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Alcemi Score Battery Energy Storage Facility

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:accde6765d218c5a74aa4685 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:889166686bb6019c4376c239
to_kindpower_object
to_idneso:connection_site:accde6765d218c5a74aa4685
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:50

Sources EV-9815e69e948d8ce0a97ba395
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 5bc37c9f9fb83048bc6acf8a496ff2f7afd9b58de8a7d9d9bb145cad12036932

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Alcemi Score Battery Energy Storage Facility

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-9815e69e948d8ce0a97ba395
MW Increase / Decrease500 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-9815e69e948d8ce0a97ba395
Cumulative Total Capacity (MW)500 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-9815e69e948d8ce0a97ba395
Detailed source fields
Original source fieldPublished value or condition
Project NameAlcemi Score Battery Energy Storage Facility
Customer NameALCEMI STORAGE DEVELOPMENTS 5 LIMITED
Connection SiteALCEMI SCORE BATTERY ENERGY STORAGE FACILITY 400KV SUBSTATION
StageNot obtained
MW Connected0.00
MW Increase / Decrease500.00
Cumulative Total Capacity (MW)500.00
MW Effective From2029-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TOSHET
Plant TypeEnergy Storage System
Project IDa0l4L0000005izQQAQ
Project NumberPRO-001575
Gate1
Original textScoping
source_record_idcsv:row:50

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:50

Sources EV-9815e69e948d8ce0a97ba395
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 5bc37c9f9fb83048bc6acf8a496ff2f7afd9b58de8a7d9d9bb145cad12036932

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Alcemi Score Battery Energy Storage Facility

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameAlcemi Score Battery Energy Storage Facility
Customer NameALCEMI STORAGE DEVELOPMENTS 5 LIMITED
Connection SiteALCEMI SCORE BATTERY ENERGY STORAGE FACILITY 400KV SUBSTATION
StageNot obtained
MW Connected0.00
MW Increase / Decrease500.00
Cumulative Total Capacity (MW)500.00
MW Effective From2029-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TOSHET
Plant TypeEnergy Storage System
Project IDa0l4L0000005izQQAQ
Project NumberPRO-001575
Gate1
Original textScoping
source_record_idcsv:row:50

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:50

Sources EV-9815e69e948d8ce0a97ba395
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 5bc37c9f9fb83048bc6acf8a496ff2f7afd9b58de8a7d9d9bb145cad12036932

Usage terms NESO Open Data Licence

Start a consultation · Choose a channel