Binn Ecopark
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-d8246e657f0bc168ccd0ef69 |
| MW Increase / Decrease | 9.9 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-d8246e657f0bc168ccd0ef69 |
| Cumulative Total Capacity (MW) | 9.9 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-d8246e657f0bc168ccd0ef69 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Binn Ecopark |
| Customer Name | Scottish Hydro Electric Power Distribution Plc |
| Connection Site | Abernethy GSP |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 9.90 |
| Cumulative Total Capacity (MW) | 9.90 |
| MW Effective From | 2028-10-31 |
| Project Status | Scoping |
| HOST TO | SHET |
| Plant Type | Waste |
| Project ID | a0l8e000000TPbqAAG |
| Project Number | PRO-003442 |
| Gate | Not obtained |
| Original text | Scoping |
| source_record_id | csv:row:65 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:65
Sources EV-d8246e657f0bc168ccd0ef69Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 8ddd1038d81b4e9a7a77c305be6c2d657e64903a3c8fda53a4413dec4e1c512e
Usage terms NESO Open Data Licence