POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_embedded

Binn Ecopark

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:d9a5ad768b491aadd9f05f2d · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_embedded:73f9a5ed3b549fde866be617
to_kindpower_object
to_idneso:connection_site:d9a5ad768b491aadd9f05f2d
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:65

Sources EV-d8246e657f0bc168ccd0ef69
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 8ddd1038d81b4e9a7a77c305be6c2d657e64903a3c8fda53a4413dec4e1c512e

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_embedded

Binn Ecopark

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-d8246e657f0bc168ccd0ef69
MW Increase / Decrease9.9 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-d8246e657f0bc168ccd0ef69
Cumulative Total Capacity (MW)9.9 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-d8246e657f0bc168ccd0ef69
Detailed source fields
Original source fieldPublished value or condition
Project NameBinn Ecopark
Customer NameScottish Hydro Electric Power Distribution Plc
Connection SiteAbernethy GSP
StageNot obtained
MW Connected0.00
MW Increase / Decrease9.90
Cumulative Total Capacity (MW)9.90
MW Effective From2028-10-31
Project StatusScoping
HOST TOSHET
Plant TypeWaste
Project IDa0l8e000000TPbqAAG
Project NumberPRO-003442
GateNot obtained
Original textScoping
source_record_idcsv:row:65

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:65

Sources EV-d8246e657f0bc168ccd0ef69
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 8ddd1038d81b4e9a7a77c305be6c2d657e64903a3c8fda53a4413dec4e1c512e

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_embedded

Binn Ecopark

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameBinn Ecopark
Customer NameScottish Hydro Electric Power Distribution Plc
Connection SiteAbernethy GSP
StageNot obtained
MW Connected0.00
MW Increase / Decrease9.90
Cumulative Total Capacity (MW)9.90
MW Effective From2028-10-31
Project StatusScoping
HOST TOSHET
Plant TypeWaste
Project IDa0l8e000000TPbqAAG
Project NumberPRO-003442
GateNot obtained
Original textScoping
source_record_idcsv:row:65

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:65

Sources EV-d8246e657f0bc168ccd0ef69
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 8ddd1038d81b4e9a7a77c305be6c2d657e64903a3c8fda53a4413dec4e1c512e

Usage terms NESO Open Data Licence

Start a consultation · Choose a channel