Burghmuir GSP
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-3191a1f581aede9d1bf7b03d |
| MW Increase / Decrease | 1.24 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-3191a1f581aede9d1bf7b03d |
| Cumulative Total Capacity (MW) | 1.24 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-3191a1f581aede9d1bf7b03d |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Burghmuir GSP |
| Customer Name | Scottish Hydro Electric Power Distribution Plc |
| Connection Site | Burghmuir 2 400/33kV GSP |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 1.24 |
| Cumulative Total Capacity (MW) | 1.24 |
| MW Effective From | 2024-09-30 |
| Project Status | Scoping |
| HOST TO | SHET |
| Plant Type | Energy Storage System;PV Array (Photo Voltaic/solar) |
| Project ID | a0l8e000000TPP3AAO |
| Project Number | PRO-003290 |
| Gate | Not obtained |
| Original text | Scoping |
| source_record_id | csv:row:96 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:96
Sources EV-3191a1f581aede9d1bf7b03dEvidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 2ccd5dc8cccbe9d8e9554779892d0cb5d5af88ac2fd7dfbadf246045e9561931
Usage terms NESO Open Data Licence
