Burghmuir GSP
接続登録 · scoping
| 指標・条件 | 出典の値 | 基準・範囲・段階 |
|---|---|---|
| MW Connected | 0 MW | 原出典の列定義 · project stage · Scoping 基準日 2026-10-01 根拠 EV-3191a1f581aede9d1bf7b03d |
| MW Increase / Decrease | 1.24 MW | 原出典の列定義 · project stage · Scoping 基準日 2026-10-01 根拠 EV-3191a1f581aede9d1bf7b03d |
| Cumulative Total Capacity (MW) | 1.24 MW | 原出典の列定義 · project stage · Scoping 基準日 2026-10-01 根拠 EV-3191a1f581aede9d1bf7b03d |
原出典の詳細項目
| 原出典項目 | 公開値・条件 |
|---|---|
| Project Name | Burghmuir GSP |
| Customer Name | Scottish Hydro Electric Power Distribution Plc |
| Connection Site | Burghmuir 2 400/33kV GSP |
| Stage | 未取得 |
| MW Connected | 0.00 |
| MW Increase / Decrease | 1.24 |
| Cumulative Total Capacity (MW) | 1.24 |
| MW Effective From | 2024-09-30 |
| Project Status | Scoping |
| HOST TO | SHET |
| Plant Type | Energy Storage System;PV Array (Photo Voltaic/solar) |
| Project ID | a0l8e000000TPP3AAO |
| Project Number | PRO-003290 |
| Gate | 未取得 |
| 原文の状態 | Scoping |
| source_record_id | csv:row:96 |
位置: 座標未取得・地図表示なし
原文・基準日・確認日 1件
資料の基準 2026-10-01 ・取得確認 2026-10-05
Supported by National Energy SO Open Data
原文内の位置 csv:row:96