Bowning Hybrid Plant
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Unit Capacity (MW AC) | 5 MWac | Original source column definition · Generation-register unit · Publicly Announced As-of date 2026-07-31 Sources EV-f9af0920d60b53e3b003bb6c |
| Aggregated Nameplate Capacity (MW AC) | 100 MWac | Original source column definition · Generation-register unit · Publicly Announced As-of date 2026-07-31 Sources EV-f9af0920d60b53e3b003bb6c |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Survey ID | 3183 |
| Site Name | Bowning Hybrid Plant |
| KCI Id | N00277, N00278 |
| Site Owner | BSR EPC Pty Ltd |
| Region | NSW1 |
| Max Site Capacity (AC) | 90 |
| Gen Info Unit ID | 318302 |
| Unit Name | BOW_GU2 |
| Technology Type | Battery Storage |
| Technology Detail | Lithium-ion |
| Dispatch Type | Scheduled |
| Unit Count | 20 |
| Unit Capacity (MW AC) | 5 |
| Aggregated Nameplate Capacity (MW AC) | 100 |
| Commitment Status | Publicly Announced |
| Survey Last Requested Date | 2026-03-10T00:00:00 |
| Survey Latest Update Date | 2026-01-22T16:34:27 |
| record_semantics | participant_reported_generation_information_not_DC_supply |
| Original text | Publicly Announced |
| source_record_id | Generator Information:178 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:178
Sources EV-f9af0920d60b53e3b003bb6cEvidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 e40382b057a1a5ea250073279552b3eb46fc84d1f1670b082473aa81ed848655
Usage terms AEMO general copyright permission subject to exceptions
