Bowning Hybrid Plant
发电机 · 计划
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Unit Capacity (MW AC) | 5 MWac | 原始来源列定义 · 发电登记单元 · Publicly Announced 基准日期 2026-07-31 依据 EV-f9af0920d60b53e3b003bb6c |
| Aggregated Nameplate Capacity (MW AC) | 100 MWac | 原始来源列定义 · 发电登记单元 · Publicly Announced 基准日期 2026-07-31 依据 EV-f9af0920d60b53e3b003bb6c |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Survey ID | 3183 |
| Site Name | Bowning Hybrid Plant |
| KCI Id | N00277, N00278 |
| Site Owner | BSR EPC Pty Ltd |
| Region | NSW1 |
| Max Site Capacity (AC) | 90 |
| Gen Info Unit ID | 318302 |
| Unit Name | BOW_GU2 |
| Technology Type | Battery Storage |
| Technology Detail | Lithium-ion |
| Dispatch Type | Scheduled |
| Unit Count | 20 |
| Unit Capacity (MW AC) | 5 |
| Aggregated Nameplate Capacity (MW AC) | 100 |
| Commitment Status | Publicly Announced |
| Survey Last Requested Date | 2026-03-10T00:00:00 |
| Survey Latest Update Date | 2026-01-22T16:34:27 |
| record_semantics | participant_reported_generation_information_not_DC_supply |
| 原文状态 | Publicly Announced |
| source_record_id | Generator Information:178 |
位置: 未获取坐标 · 不在地图标注
原文、基准日期与核实日期 1条
数据来源 2026-07-31 · 收集核实 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
原文位置 Generator Information:178
依据 EV-f9af0920d60b53e3b003bb6c资料SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 e40382b057a1a5ea250073279552b3eb46fc84d1f1670b082473aa81ed848655
使用条件 AEMO general copyright permission subject to exceptions