Australia · Generator · plant location

Bolivar Power Station

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Bolivar Power Station

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW AC)32.1 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-943079c4dc935abd2c2876ff
Aggregated Nameplate Capacity (MW AC)32.1 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-943079c4dc935abd2c2876ff
Detailed source fields
Original source fieldPublished value or condition
Survey ID1533
Site NameBolivar Power Station
Site OwnerIberdrola Australia Energy Markets Pty Limited
RegionSA1
Max Site Capacity (AC)127
Gen Info Unit ID153304
Unit NameBOLINF3
Technology TypeGas Turbine
Technology DetailOCGT
Gas Turbine Fuel TypeNatural Gas
DUIDBOLIVPS1
Dispatch TypeScheduled
Unit Count1
Unit Capacity (MW AC)32.1
Aggregated Nameplate Capacity (MW AC)32.1
Commitment StatusIn Service
Expected Closure Year2045
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-05-19T10:23:38
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idGenerator Information:149

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:149

Sources EV-943079c4dc935abd2c2876ff
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 03b73a73759f1577df6359ae79b3429d1870312f3572ba764862d5d399b27a18

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:70

Sources EV-254d3afcc96e5b28eb8761b7
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 4114673e212c954ffaf7364208915305c5015beb4193ab45b8f7ac012525b0ac

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

Start a consultation · Choose a channel