POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 33items · current page 1–33 · Source records, not unique facilities.
Power assets and projects · AUS · aemo_generation Bolivar Power Station Generator · Operations
Metric or condition Source value Basis, scope and stage Unit Capacity (MW AC) 32.1 MWac Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-943079c4dc935abd2c2876ff Aggregated Nameplate Capacity (MW AC) 32.1 MWac Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-943079c4dc935abd2c2876ff
Detailed source fields Original source field Published value or condition Survey ID 1533 Site Name Bolivar Power Station Site Owner Iberdrola Australia Energy Markets Pty Limited Region SA1 Max Site Capacity (AC) 127 Gen Info Unit ID 153304 Unit Name BOLINF3 Technology Type Gas Turbine Technology Detail OCGT Gas Turbine Fuel Type Natural Gas DUID BOLIVPS1 Dispatch Type Scheduled Unit Count 1 Unit Capacity (MW AC) 32.1 Aggregated Nameplate Capacity (MW AC) 32.1 Commitment Status In Service Expected Closure Year 2045 Survey Last Requested Date 2026-03-10T00:00:00 Survey Latest Update Date 2026-05-19T10:23:38 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Generator Information:149
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 2items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:149
Sources EV-943079c4dc935abd2c2876ff Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 03b73a73759f1577df6359ae79b3429d1870312f3572ba764862d5d399b27a18 Usage terms AEMO general copyright permission subject to exceptions
aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:70
Sources EV-254d3afcc96e5b28eb8761b7 Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 4114673e212c954ffaf7364208915305c5015beb4193ab45b8f7ac012525b0ac Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Region SA1 AEMO Survey ID 1533 Gen Info Unit ID 153304 Site Name Bolivar Power Station DUID BOLIVPS1 Commitment Status In Service Expected Closure Year 2045 Survey Latest Update Date 2026-05-19T10:23:38 Publication Date 2024-07-24T00:00:00 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Expected Closure Year:70
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:70
Sources EV-254d3afcc96e5b28eb8761b7 Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 4114673e212c954ffaf7364208915305c5015beb4193ab45b8f7ac012525b0ac Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Survey ID 1533 Site Name Bolivar Power Station Site Owner Iberdrola Australia Energy Markets Pty Limited Region SA1 Max Site Capacity (AC) 127 Gen Info Unit ID 153304 Unit Name BOLINF3 Technology Type Gas Turbine Technology Detail OCGT Gas Turbine Fuel Type Natural Gas DUID BOLIVPS1 Dispatch Type Scheduled Unit Count 1 Unit Capacity (MW AC) 32.1 Aggregated Nameplate Capacity (MW AC) 32.1 Commitment Status In Service Expected Closure Year 2045 Survey Last Requested Date 2026-03-10T00:00:00 Survey Latest Update Date 2026-05-19T10:23:38 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Generator Information:149
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:149
Sources EV-943079c4dc935abd2c2876ff Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 03b73a73759f1577df6359ae79b3429d1870312f3572ba764862d5d399b27a18 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 24.8 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-943079c4dc935abd2c2876ff 측정·전망기간 Summer Peak 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:149
Sources EV-943079c4dc935abd2c2876ff Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 03b73a73759f1577df6359ae79b3429d1870312f3572ba764862d5d399b27a18 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 27.1 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-943079c4dc935abd2c2876ff 측정·전망기간 Summer Typical 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:149
Sources EV-943079c4dc935abd2c2876ff Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 03b73a73759f1577df6359ae79b3429d1870312f3572ba764862d5d399b27a18 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 27.1 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-943079c4dc935abd2c2876ff 측정·전망기간 Summer Typical 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:149
Sources EV-943079c4dc935abd2c2876ff Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 03b73a73759f1577df6359ae79b3429d1870312f3572ba764862d5d399b27a18 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 24.8 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-943079c4dc935abd2c2876ff 측정·전망기간 Summer Peak 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:149
Sources EV-943079c4dc935abd2c2876ff Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 03b73a73759f1577df6359ae79b3429d1870312f3572ba764862d5d399b27a18 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 27.1 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-943079c4dc935abd2c2876ff 측정·전망기간 Summer Typical 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:149
Sources EV-943079c4dc935abd2c2876ff Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 03b73a73759f1577df6359ae79b3429d1870312f3572ba764862d5d399b27a18 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 31.4 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-943079c4dc935abd2c2876ff 측정·전망기간 Winter 2032
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:149
Sources EV-943079c4dc935abd2c2876ff Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 03b73a73759f1577df6359ae79b3429d1870312f3572ba764862d5d399b27a18 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 31.4 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-943079c4dc935abd2c2876ff 측정·전망기간 Winter 2029
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:149
Sources EV-943079c4dc935abd2c2876ff Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 03b73a73759f1577df6359ae79b3429d1870312f3572ba764862d5d399b27a18 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 27.1 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-943079c4dc935abd2c2876ff 측정·전망기간 Summer Typical 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:149
Sources EV-943079c4dc935abd2c2876ff Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 03b73a73759f1577df6359ae79b3429d1870312f3572ba764862d5d399b27a18 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 24.8 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-943079c4dc935abd2c2876ff 측정·전망기간 Summer Peak 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:149
Sources EV-943079c4dc935abd2c2876ff Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 03b73a73759f1577df6359ae79b3429d1870312f3572ba764862d5d399b27a18 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 31.4 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-943079c4dc935abd2c2876ff 측정·전망기간 Winter 2031
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:149
Sources EV-943079c4dc935abd2c2876ff Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 03b73a73759f1577df6359ae79b3429d1870312f3572ba764862d5d399b27a18 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 27.1 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-943079c4dc935abd2c2876ff 측정·전망기간 Summer Typical 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:149
Sources EV-943079c4dc935abd2c2876ff Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 03b73a73759f1577df6359ae79b3429d1870312f3572ba764862d5d399b27a18 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 31.4 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-943079c4dc935abd2c2876ff 측정·전망기간 Winter 2034
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:149
Sources EV-943079c4dc935abd2c2876ff Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 03b73a73759f1577df6359ae79b3429d1870312f3572ba764862d5d399b27a18 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 24.8 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-943079c4dc935abd2c2876ff 측정·전망기간 Summer Peak 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:149
Sources EV-943079c4dc935abd2c2876ff Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 03b73a73759f1577df6359ae79b3429d1870312f3572ba764862d5d399b27a18 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 27.1 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-943079c4dc935abd2c2876ff 측정·전망기간 Summer Typical 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:149
Sources EV-943079c4dc935abd2c2876ff Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 03b73a73759f1577df6359ae79b3429d1870312f3572ba764862d5d399b27a18 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 24.8 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-943079c4dc935abd2c2876ff 측정·전망기간 Summer Peak 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:149
Sources EV-943079c4dc935abd2c2876ff Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 03b73a73759f1577df6359ae79b3429d1870312f3572ba764862d5d399b27a18 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 24.8 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-943079c4dc935abd2c2876ff 측정·전망기간 Summer Peak 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:149
Sources EV-943079c4dc935abd2c2876ff Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 03b73a73759f1577df6359ae79b3429d1870312f3572ba764862d5d399b27a18 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 31.4 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-943079c4dc935abd2c2876ff 측정·전망기간 Winter 2028
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:149
Sources EV-943079c4dc935abd2c2876ff Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 03b73a73759f1577df6359ae79b3429d1870312f3572ba764862d5d399b27a18 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 24.8 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-943079c4dc935abd2c2876ff 측정·전망기간 Summer Peak 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:149
Sources EV-943079c4dc935abd2c2876ff Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 03b73a73759f1577df6359ae79b3429d1870312f3572ba764862d5d399b27a18 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 27.1 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-943079c4dc935abd2c2876ff 측정·전망기간 Summer Typical 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:149
Sources EV-943079c4dc935abd2c2876ff Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 03b73a73759f1577df6359ae79b3429d1870312f3572ba764862d5d399b27a18 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 27.1 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-943079c4dc935abd2c2876ff 측정·전망기간 Summer Typical 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:149
Sources EV-943079c4dc935abd2c2876ff Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 03b73a73759f1577df6359ae79b3429d1870312f3572ba764862d5d399b27a18 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 24.8 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-943079c4dc935abd2c2876ff 측정·전망기간 Summer Peak 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:149
Sources EV-943079c4dc935abd2c2876ff Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 03b73a73759f1577df6359ae79b3429d1870312f3572ba764862d5d399b27a18 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 31.4 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-943079c4dc935abd2c2876ff 측정·전망기간 Winter 2033
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:149
Sources EV-943079c4dc935abd2c2876ff Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 03b73a73759f1577df6359ae79b3429d1870312f3572ba764862d5d399b27a18 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 31.4 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-943079c4dc935abd2c2876ff 측정·전망기간 Winter 2026
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:149
Sources EV-943079c4dc935abd2c2876ff Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 03b73a73759f1577df6359ae79b3429d1870312f3572ba764862d5d399b27a18 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 31.4 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-943079c4dc935abd2c2876ff 측정·전망기간 Winter 2030
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:149
Sources EV-943079c4dc935abd2c2876ff Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 03b73a73759f1577df6359ae79b3429d1870312f3572ba764862d5d399b27a18 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 27.1 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-943079c4dc935abd2c2876ff 측정·전망기간 Summer Typical 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:149
Sources EV-943079c4dc935abd2c2876ff Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 03b73a73759f1577df6359ae79b3429d1870312f3572ba764862d5d399b27a18 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 31.4 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-943079c4dc935abd2c2876ff 측정·전망기간 Winter 2027
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:149
Sources EV-943079c4dc935abd2c2876ff Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 03b73a73759f1577df6359ae79b3429d1870312f3572ba764862d5d399b27a18 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 24.8 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-943079c4dc935abd2c2876ff 측정·전망기간 Summer Peak 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:149
Sources EV-943079c4dc935abd2c2876ff Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 03b73a73759f1577df6359ae79b3429d1870312f3572ba764862d5d399b27a18 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 31.4 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-943079c4dc935abd2c2876ff 측정·전망기간 Winter 2035
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:149
Sources EV-943079c4dc935abd2c2876ff Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 03b73a73759f1577df6359ae79b3429d1870312f3572ba764862d5d399b27a18 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 27.1 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-943079c4dc935abd2c2876ff 측정·전망기간 Summer Typical 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:149
Sources EV-943079c4dc935abd2c2876ff Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 03b73a73759f1577df6359ae79b3429d1870312f3572ba764862d5d399b27a18 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 24.8 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-943079c4dc935abd2c2876ff 측정·전망기간 Summer Peak 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:149
Sources EV-943079c4dc935abd2c2876ff Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 03b73a73759f1577df6359ae79b3429d1870312f3572ba764862d5d399b27a18 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset