Australia · Generator · plant location

Battery of the Nation - Stage 2b

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Battery of the Nation - Stage 2b

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW AC)187.5 MWacOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-0bb1d0a34e4e36b20c52d979
Aggregated Nameplate Capacity (MW AC)750 MWacOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-0bb1d0a34e4e36b20c52d979
Agg Nameplate Storage Capacity (MWh)12000 MWhOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-0bb1d0a34e4e36b20c52d979
Detailed source fields
Original source fieldPublished value or condition
Survey ID1480
Site NameBattery of the Nation - Stage 2b
Site OwnerHydro Tasmania
RegionTAS1
Max Site Capacity (AC)750
Gen Info Unit ID148001
Unit NameStage 2b
Technology TypeHydro
Technology DetailPumped Hydro
Dispatch TypeScheduled
Unit Count4
Unit Capacity (MW AC)187.5
Aggregated Nameplate Capacity (MW AC)750
Agg Nameplate Storage Capacity (MWh)12000
Commitment StatusPublicly Announced
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-03-24T17:51:05
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textPublicly Announced
source_record_idGenerator Information:75

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:75

Sources EV-0bb1d0a34e4e36b20c52d979
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 69efbf96eefb660b1bbc506baca71792146c487765d8aa2871ea03207ed9174a