Battery of the Nation - Stage 2b
発電機 · 計画
| 指標・条件 | 出典の値 | 基準・範囲・段階 |
|---|---|---|
| Unit Capacity (MW AC) | 187.5 MWac | 原出典の列定義 · 発電登録単位 · Publicly Announced 基準日 2026-07-31 根拠 EV-0bb1d0a34e4e36b20c52d979 |
| Aggregated Nameplate Capacity (MW AC) | 750 MWac | 原出典の列定義 · 発電登録単位 · Publicly Announced 基準日 2026-07-31 根拠 EV-0bb1d0a34e4e36b20c52d979 |
| Agg Nameplate Storage Capacity (MWh) | 12000 MWh | 原出典の列定義 · 発電登録単位 · Publicly Announced 基準日 2026-07-31 根拠 EV-0bb1d0a34e4e36b20c52d979 |
原出典の詳細項目
| 原出典項目 | 公開値・条件 |
|---|---|
| Survey ID | 1480 |
| Site Name | Battery of the Nation - Stage 2b |
| Site Owner | Hydro Tasmania |
| Region | TAS1 |
| Max Site Capacity (AC) | 750 |
| Gen Info Unit ID | 148001 |
| Unit Name | Stage 2b |
| Technology Type | Hydro |
| Technology Detail | Pumped Hydro |
| Dispatch Type | Scheduled |
| Unit Count | 4 |
| Unit Capacity (MW AC) | 187.5 |
| Aggregated Nameplate Capacity (MW AC) | 750 |
| Agg Nameplate Storage Capacity (MWh) | 12000 |
| Commitment Status | Publicly Announced |
| Survey Last Requested Date | 2026-03-10T00:00:00 |
| Survey Latest Update Date | 2026-03-24T17:51:05 |
| record_semantics | participant_reported_generation_information_not_DC_supply |
| 原文の状態 | Publicly Announced |
| source_record_id | Generator Information:75 |
位置: 座標未取得・地図表示なし
原文・基準日・確認日 1件
資料の基準 2026-07-31 ・取得確認 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
原文内の位置 Generator Information:75
根拠 EV-0bb1d0a34e4e36b20c52d979資料SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 69efbf96eefb660b1bbc506baca71792146c487765d8aa2871ea03207ed9174a
利用条件 AEMO general copyright permission subject to exceptions
