Australia · Generator · plant location

Broadwater

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Broadwater

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW AC)38 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-dec721b8f2bcc66301e655a4
Aggregated Nameplate Capacity (MW AC)38 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-dec721b8f2bcc66301e655a4
Detailed source fields
Original source fieldPublished value or condition
Survey ID1439
Site NameBroadwater
Site OwnerCape Byron Management PTY LTD
RegionNSW1
Max Site Capacity (AC)38
Gen Info Unit ID143903
Unit NameBWR
Technology TypeGas Turbine
Technology DetailSteam Turbine
Gas Turbine Fuel TypeBiofuel/Biomass
DUIDBWTR1
Dispatch TypeNon-scheduled
Unit Count1
Unit Capacity (MW AC)38
Aggregated Nameplate Capacity (MW AC)38
Commitment StatusIn Service
Expected Closure Year2038
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-03-27T12:49:53
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idGenerator Information:197

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:197

Sources EV-dec721b8f2bcc66301e655a4
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9270df004b23756aea49528a9c4e03f4e8fd08a81d2448f374962457de8d8a5e

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:89

Sources EV-56f900e201d23656cd96b7ac
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 1496286b970cf033caef3c6d243422fbe8243efe881fddb049769a8cda872333

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

Start a consultation · Choose a channel