Broadwater
発電機 · 運営
| 指標・条件 | 出典の値 | 基準・範囲・段階 |
|---|---|---|
| Unit Capacity (MW AC) | 38 MWac | 原出典の列定義 · 発電登録単位 · In Service 基準日 2026-07-31 根拠 EV-dec721b8f2bcc66301e655a4 |
| Aggregated Nameplate Capacity (MW AC) | 38 MWac | 原出典の列定義 · 発電登録単位 · In Service 基準日 2026-07-31 根拠 EV-dec721b8f2bcc66301e655a4 |
原出典の詳細項目
| 原出典項目 | 公開値・条件 |
|---|---|
| Survey ID | 1439 |
| Site Name | Broadwater |
| Site Owner | Cape Byron Management PTY LTD |
| Region | NSW1 |
| Max Site Capacity (AC) | 38 |
| Gen Info Unit ID | 143903 |
| Unit Name | BWR |
| Technology Type | Gas Turbine |
| Technology Detail | Steam Turbine |
| Gas Turbine Fuel Type | Biofuel/Biomass |
| DUID | BWTR1 |
| Dispatch Type | Non-scheduled |
| Unit Count | 1 |
| Unit Capacity (MW AC) | 38 |
| Aggregated Nameplate Capacity (MW AC) | 38 |
| Commitment Status | In Service |
| Expected Closure Year | 2038 |
| Survey Last Requested Date | 2026-03-10T00:00:00 |
| Survey Latest Update Date | 2026-03-27T12:49:53 |
| record_semantics | participant_reported_generation_information_not_DC_supply |
| 原文の状態 | In Service |
| source_record_id | Generator Information:197 |
位置: 座標未取得・地図表示なし
原文・基準日・確認日 2件
資料の基準 2026-07-31 ・取得確認 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
原文内の位置 Generator Information:197
根拠 EV-dec721b8f2bcc66301e655a4資料SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9270df004b23756aea49528a9c4e03f4e8fd08a81d2448f374962457de8d8a5e
利用条件 AEMO general copyright permission subject to exceptions
資料の基準 2026-07-24 ・取得確認 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
原文内の位置 Expected Closure Year:89
根拠 EV-56f900e201d23656cd96b7ac資料SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 1496286b970cf033caef3c6d243422fbe8243efe881fddb049769a8cda872333
利用条件 AEMO general copyright permission subject to exceptions
