Australia · Generator · plant location

Beryl Solar Farm

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Beryl Solar Farm

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW DC)1.64 MWdcOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-fefe78f5ad377a3089021908
Unit Capacity (MW AC)1.64 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-fefe78f5ad377a3089021908
Aggregated Nameplate Capacity (MW DC)98.4 MWdcOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-fefe78f5ad377a3089021908
Aggregated Nameplate Capacity (MW AC)98.4 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-fefe78f5ad377a3089021908
Detailed source fields
Original source fieldPublished value or condition
Survey ID1416
Site NameBeryl Solar Farm
Site OwnerFS NSW Project No 1 AT Pty Ltd as trustee of FS NSW Project No 1 Asset Trust
RegionNSW1
Max Site Capacity (AC)87
Gen Info Unit ID141601
Unit NameBERYLSF
Technology TypeSolar PV
Technology DetailSingle Axis Tracking
DUIDBERYLSF1
Dispatch TypeSemi-scheduled
Unit Count60
Unit Capacity (MW DC)1.64
Unit Capacity (MW AC)1.64
Aggregated Nameplate Capacity (MW DC)98.4
Aggregated Nameplate Capacity (MW AC)98.4
Commitment StatusIn Service
Expected Closure Year2049
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-05-22T10:15:55
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idGenerator Information:107

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:107

Sources EV-fefe78f5ad377a3089021908
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 583e69c2e0096925d2a4538e0481069f909998ef5e27bdb0156eb2f558e6c7af

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:48

Sources EV-fb1404e30cb6392b950728e4
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 45348aa0dbe1f109f4ff12b9cddd73c9ebd492370d592dff1a555b0e3318dfa4

Usage terms AEMO general copyright permission subject to exceptions