Australia · Generator · plant location

Bolivar Waste Water Treatment

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Bolivar Waste Water Treatment

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW AC)2.5 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-579e2efaff7d9248903f807b
Aggregated Nameplate Capacity (MW AC)7.5 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-579e2efaff7d9248903f807b
Detailed source fields
Original source fieldPublished value or condition
Survey ID1393
Site NameBolivar Waste Water Treatment
Site OwnerSouth Australian Water Corporation
RegionSA1
Max Site Capacity (AC)17.5
Gen Info Unit ID139306
Unit NameBolivar waste water treament:1-4
Technology TypeGas Turbine
Technology DetailOCGT
Gas Turbine Fuel TypeBiofuel/Biomass
Dispatch TypeNon-scheduled
Unit Count3
Unit Capacity (MW AC)2.5
Aggregated Nameplate Capacity (MW AC)7.5
Commitment StatusIn Service
Expected Closure Year2045
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-03-11T12:37:01
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idGenerator Information:153

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:153

Sources EV-579e2efaff7d9248903f807b
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 303d968c7d31264706cb1ff38b10b7e1785fb66f5b36325e9867ab2f235e608d

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:74

Sources EV-53e9a21bef217872483f59ef
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 051f2e8de674da09c21704e344585db4a9ead82a62a90bad707f6b4524be43a6

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

Start a consultation · Choose a channel