Bolivar Waste Water Treatment
发电机 · 运营
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Unit Capacity (MW AC) | 2.5 MWac | 原始来源列定义 · 发电登记单元 · In Service 基准日期 2026-07-31 依据 EV-579e2efaff7d9248903f807b |
| Aggregated Nameplate Capacity (MW AC) | 7.5 MWac | 原始来源列定义 · 发电登记单元 · In Service 基准日期 2026-07-31 依据 EV-579e2efaff7d9248903f807b |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Survey ID | 1393 |
| Site Name | Bolivar Waste Water Treatment |
| Site Owner | South Australian Water Corporation |
| Region | SA1 |
| Max Site Capacity (AC) | 17.5 |
| Gen Info Unit ID | 139306 |
| Unit Name | Bolivar waste water treament:1-4 |
| Technology Type | Gas Turbine |
| Technology Detail | OCGT |
| Gas Turbine Fuel Type | Biofuel/Biomass |
| Dispatch Type | Non-scheduled |
| Unit Count | 3 |
| Unit Capacity (MW AC) | 2.5 |
| Aggregated Nameplate Capacity (MW AC) | 7.5 |
| Commitment Status | In Service |
| Expected Closure Year | 2045 |
| Survey Last Requested Date | 2026-03-10T00:00:00 |
| Survey Latest Update Date | 2026-03-11T12:37:01 |
| record_semantics | participant_reported_generation_information_not_DC_supply |
| 原文状态 | In Service |
| source_record_id | Generator Information:153 |
位置: 未获取坐标 · 不在地图标注
原文、基准日期与核实日期 2条
数据来源 2026-07-31 · 收集核实 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
原文位置 Generator Information:153
依据 EV-579e2efaff7d9248903f807b资料SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 303d968c7d31264706cb1ff38b10b7e1785fb66f5b36325e9867ab2f235e608d
使用条件 AEMO general copyright permission subject to exceptions
数据来源 2026-07-24 · 收集核实 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
原文位置 Expected Closure Year:74
依据 EV-53e9a21bef217872483f59ef资料SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 051f2e8de674da09c21704e344585db4a9ead82a62a90bad707f6b4524be43a6
使用条件 AEMO general copyright permission subject to exceptions
