Australia · Generator · plant location

Bolivar Waste Water Treatment

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Bolivar Waste Water Treatment

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW AC)2.75 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-845dea972b0108af9d64d15c
Aggregated Nameplate Capacity (MW AC)8.25 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-845dea972b0108af9d64d15c
Detailed source fields
Original source fieldPublished value or condition
Survey ID1393
Site NameBolivar Waste Water Treatment
Site OwnerSouth Australian Water Corporation
RegionSA1
Max Site Capacity (AC)17.5
Gen Info Unit ID139305
Unit NameBOWWPV1
Technology TypeSolar PV
Technology DetailFixed
DUIDBOWWPV1
Dispatch TypeSemi-scheduled
Unit Count3
Unit Capacity (MW AC)2.75
Aggregated Nameplate Capacity (MW AC)8.25
Commitment StatusIn Service
Expected Closure Year2041
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-03-11T12:37:01
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idGenerator Information:152

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:152

Sources EV-845dea972b0108af9d64d15c
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 0c438ec4301004b61461ef883b39ca4e3350d652a0bb59084ca836cbb1a71693

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:73

Sources EV-084a1b29828bad3c5721ca10
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 1775869f53a220d3708c9f412930c9ca35f1536027ec2de00b6b2bef3a10c112

Usage terms AEMO general copyright permission subject to exceptions