Bolivar Waste Water Treatment
发电机 · 运营
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Unit Capacity (MW AC) | 2.75 MWac | 原始来源列定义 · 发电登记单元 · In Service 基准日期 2026-07-31 依据 EV-845dea972b0108af9d64d15c |
| Aggregated Nameplate Capacity (MW AC) | 8.25 MWac | 原始来源列定义 · 发电登记单元 · In Service 基准日期 2026-07-31 依据 EV-845dea972b0108af9d64d15c |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Survey ID | 1393 |
| Site Name | Bolivar Waste Water Treatment |
| Site Owner | South Australian Water Corporation |
| Region | SA1 |
| Max Site Capacity (AC) | 17.5 |
| Gen Info Unit ID | 139305 |
| Unit Name | BOWWPV1 |
| Technology Type | Solar PV |
| Technology Detail | Fixed |
| DUID | BOWWPV1 |
| Dispatch Type | Semi-scheduled |
| Unit Count | 3 |
| Unit Capacity (MW AC) | 2.75 |
| Aggregated Nameplate Capacity (MW AC) | 8.25 |
| Commitment Status | In Service |
| Expected Closure Year | 2041 |
| Survey Last Requested Date | 2026-03-10T00:00:00 |
| Survey Latest Update Date | 2026-03-11T12:37:01 |
| record_semantics | participant_reported_generation_information_not_DC_supply |
| 原文状态 | In Service |
| source_record_id | Generator Information:152 |
位置: 未获取坐标 · 不在地图标注
原文、基准日期与核实日期 2条
数据来源 2026-07-31 · 收集核实 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
原文位置 Generator Information:152
依据 EV-845dea972b0108af9d64d15c资料SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 0c438ec4301004b61461ef883b39ca4e3350d652a0bb59084ca836cbb1a71693
使用条件 AEMO general copyright permission subject to exceptions
数据来源 2026-07-24 · 收集核实 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
原文位置 Expected Closure Year:73
依据 EV-084a1b29828bad3c5721ca10资料SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 1775869f53a220d3708c9f412930c9ca35f1536027ec2de00b6b2bef3a10c112
使用条件 AEMO general copyright permission subject to exceptions
