Australia · Generator · plant location

Bolivar Waste Water Treatment

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Bolivar Waste Water Treatment

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW AC)2.52 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-6b666e2304c32eba43099364
Aggregated Nameplate Capacity (MW AC)2.52 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-6b666e2304c32eba43099364
Agg Nameplate Storage Capacity (MWh)5.04 MWhOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-6b666e2304c32eba43099364
Detailed source fields
Original source fieldPublished value or condition
Survey ID1393
Site NameBolivar Waste Water Treatment
Site OwnerSouth Australian Water Corporation
RegionSA1
Max Site Capacity (AC)17.5
Gen Info Unit ID139304
Unit NameBOWWBA1
Technology TypeBattery Storage
Technology DetailLithium-ion
DUIDBOWWBA1
Dispatch TypeScheduled
Unit Count1
Unit Capacity (MW AC)2.52
Aggregated Nameplate Capacity (MW AC)2.52
Agg Nameplate Storage Capacity (MWh)5.04
Commitment StatusIn Service
Expected Closure Year2045
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-03-11T12:37:01
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idGenerator Information:151

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:151

Sources EV-6b666e2304c32eba43099364
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:72

Sources EV-c97d3f649fda13b6f448c57f
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 969603cfabbdda8da4cf2d0b18927d91dfbf4025ba37fd107bd35bae4bf05988

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

Start a consultation · Choose a channel